Laserfiche WebLink
July 21, 1987 <br /> <br />PAY ESTIMATE NO. 6 (FINAL) <br /> <br />Honorable Mayor & City Council <br />City of Ramsey <br />15153 Nowthen Boulevard N.W. <br />Ramsey, Minnesota 55303 <br /> <br />Re:Construction of Municipal Well No. 2 & Modification to Pumphouse No. 1 <br /> Contractor: E.H. Renner & Sons <br /> Bid Amount: $112,306.25'*** <br /> Award Date: October 8, 1986 <br /> Completion Date: May 15, 1987'*** <br /> <br />Dear Council Members: <br /> <br />The following work has been completed on the above referenced project by <br />E.H. Renner & Sons, Inc. <br /> <br />SCHEDULE 1.000 - MUNICIPAL WELL NO. 2 <br /> Used <br />Item to Date <br /> <br />Estimated <br />Quantity Unit Price <br /> <br />Extension <br /> <br />1. Mobilization & Demobilization 1 LS <br />2. Drill 8" Testhole 0 LF <br />3. Drill Nominal 20" Open Hole 240 LF <br />4. Furnish & Place 14" Cashing 245 LF <br />5. Neat Cement Grout 94" Bag 216 EA <br />6. Drill 13" Open Hole 80 LF <br />7. Developing Well 0 CY <br />8. F&I Air Develop. Equip. 4 EA <br />9. Air Development 86.75 HR <br />10.Install & Remove Test Pump 4 EA <br />ll. Test Pumping 49.5 HR <br />12. Dynamite 0 LB <br />13.Test Pumping Discharge Pipe 0 LF <br />14.Electric Log & Report 0 LS <br />15.Disinfection 1 LS <br />16.Water Analysis 1 LS <br />17.E-Log/Video Tape Well** 1 LS <br />18.Install Electric Motor for <br /> Test Pumping** 1 LS <br />19.Test Pump Well with Electric <br /> Motor** 150 HR <br />20.Furnish 8" Dia. Stainless <br /> Steel Screen*** 63 LF <br />21.Furnish 8" Dia. Steel Leader <br /> Pipe*** 40 LF <br />22.Furnish #30 EauClair Gravel <br /> Pack*** 67 CF <br />23.Provide Labor to Install <br /> Screen & Gravel Pack*** 16 HR <br />24.Test Pump Gravel Pack Well*** 13 HR <br />25.Provide Labor & Equipment to <br /> <br />Remove Screen & Gravel Pack****13.75 HR <br /> <br />1 LS $4,700.00 /LS <br />0 LF* $8.00 /LF <br />240 LF $25.00 /LF <br />245 LF $22.50 /LF <br />225 EA* $8.00 /EA <br />80 LF $20.00 /LF <br />50 CY $35.00 /CY <br />3 EA**** $500.00 /EA <br />70 HR $115.00 /HR <br /> <br />4 EA**** $1,800.00 /EA <br /> <br />38 HR**** $125.00 /HR <br />0 LB* $0.50 /LB <br />100 nF $1.00 /LF <br />0 LS* $250.00 /LS <br />1 IS $50.00 /LS <br />1 LS $250.00 /LS <br />1 LS $1,000.00 /LS <br /> <br />1 LS $450.00 /LS <br /> <br />$4,700.00 <br />$0.00 <br />$6,000.00 <br />$5,512.50 <br />$1,728.00 <br />$1,600.00 <br />$0.00 <br />$2,000.00 <br />$9,976.25 <br />$7,200.00 <br />$6,187.50 <br />$0.00 <br />$0.00 <br />$0.00 <br />$5O.OO <br />$250.00 <br />$1,000.00 <br /> <br />$450.00 <br /> <br />150 HR $10.00 /HR $1,500.00 <br /> <br />55 LF $104.73 /LF $6,597.99 <br /> <br />40 LF $18.00 /LF $720.00 <br /> <br />60 CF $7.20 /CF $482.40 <br /> <br />TOTAL SCHEDULE 1.000: <br /> <br /> *Per Change Order No. 1 <br />**Per Change Order No. 2 <br /> <br />16 HR $100.00 /HR $1,600.00 <br />10 HR $10.00 /HR $130.00 <br /> <br />16 HR $145.00 /HR $1,993.75 <br /> <br /> ***Per Change Order No. 3 <br />****Per Change Order No. 4 <br /> <br />$59,678.39 <br /> <br /> <br />