Laserfiche WebLink
The draft preliminary bridge plans included in the report may <br />be advanced to a complete preliminary plan for review and <br />approval by the MnDOT Bridge Office Preliminary Plan Review <br />Unit. Upon approval of the preliminary plan, the final design <br />and plans may be prepared and reviewed per the Cooperative <br />Construction Agreement Process. <br />Preparation of funding applications and requests for letters of <br />support may begin at this time while other steps outlined above <br />are on -going. <br />N :1d III, :.n; �.. II II• II .li, i. i ,.. rlll i �j,-..,ii. �II I•. ;i �'J�I lit�lhi�l''�lltll <br />u i p, I,I r lln N IIL tl 11 illd lu w , `'ll'Irr Ira <br />1 <br />Appendix E, Figure 20 — Preferred Concept D View from TH 10 <br />dli"ii n u <br />IIIIIII II _ II �10.1 <br />Appendix E, Figure 19 — Preferred Concept D View of helix structure from the south <br />Appendix E, Figure 18 — Preferred Concept D Bird's eye view <br />December 2014 <br />Mississippi Skyway OverTH10 Preliminary Engineering Report iv <br />