On May 24th the City Council accepted final plans and specifications and authorized advertisements for bids. One <br />addendum was issued during the bidding process for the purpose of revising a street name on the title sheet and <br />revising the bid proposal to add removal items for 62 feet of storm sewer pipe, one catch basin, and one pipe apron. <br />On June 21st six (6) sealed bids were received and publicly opened and read aloud. City staff then checked each <br />bid for errors and omissions and tabulated the bids. All bids were found to be competitive and favorable and <br />complied with the advertisement for bids. Two bids required adjustments based on staff review as noted in the bid <br />summary tabulation below (and in the attached resolution). <br />CONTRACTOR <br />New Look Contracting, Inc. <br />Matt Bullock Contracting Company, Inc. <br />Veit & Company, Inc. <br />Dryden Excavating, Inc. <br />Ramsey Excavating Co. <br />All Metro Excavating Inc. <br />Engineer's Estimate <br />TOTAL BID <br />$165,480.50 <br />$168,869.90 <br />$174,041.17 <br />$190,746.80* <br />$228,027.70 <br />$226,158.50* <br />$181, 777.05 <br />* Bid amount adjusted based on unit prices submitted. <br />Of the six bids received, the lowest responsible bid was submitted by New Look Contracting, Inc. of Rogers, <br />Minnesota, in the amount of $165,480.50. This bid is $16,296.55 or 9% less than the engineer's estimate of <br />$181,777.05. <br />Following award of contract, staff will issue a Notice of Award to New Look Contracting, Inc. to initiate execution <br />of a contract and the issuance of required bonds and insurance. The City Attorney will then verify the contract, <br />bonds and insurance are in the proper amounts and are in proper legal form prior to execution of the contract. Once <br />the contract is executed, staff will issue a Notice to Proceed allowing construction to begin. At this time it is <br />anticipated construction will begin on or after July 1 lth and will be completed within 60 days after work starts. <br />Notification: <br />No notifications were required for this case. Advertisements for bids were published in the Anoka Union Herald <br />and in Finance and Commerce on May 27th and June 3rd, 2016. <br />Observations/Alternatives: <br />Observations: <br />The storm sewer improvements proposed to be constructed within public drainage and utility easements between <br />the properties at 6250 and 6390 McKinley Street are located between a parking lot and a drive aisle, both of which <br />have paved surfaces with curb and gutter. Construction will be completed so as to negate or minimize disturbance <br />to any private infrastructure. At the time this case was prepared, Staff had not yet had the opportunity to discuss the <br />proposed improvements and work schedule with the business/property owners. If Staff is able to meet with the <br />business/property owners prior to the Council meeting, any pertinent information will be shared with Council <br />during Staff's presentation. Otherwise, Staff will coordinate the proposed work with the business/property owners to <br />ensure this work will not negatively impact the properties or business operations. <br />Alternatives: <br />Alternative #1 — Motion adopting Resolution #16-06-121 accepting bids and awarding a contract for construction <br />for City Improvement Project #16-36, Business Park 95 Regional Stormwater Pond Improvements. <br />Alternative #2 — Motion denying adoption of Resolution #16-06-121 at this time. <br />Funding Source: <br />