Laserfiche WebLink
Building Inspections <br />18 <br />19 <br />Did not pull permit. <br />I do plumbing permits, and its usually paid for on the building permit, which is great for us!!! I always have a great <br />relationship with the people working the building desk. Have never had any problems picking up a meter when needed <br />also!! <br />20 I inspect and design septic systems only and do not obtain building permits. (? # 3) However, I am a licensed building <br />official and am very satisfied with record retention and ease of getting address information. <br />I have always had a very good experience with pulling and closing permits in Ramsey <br />Sometimes the process would take 2 or 3 weeks. Andover turns them over in days. <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />It would be better if it could all be done online, like Coon Rapids, then at then end you can print off the permit rather <br />than waiting for it to be emailed or mailed. Also, when we are applying for a Mechanical permit, why do we get <br />"punished" trying to do work for the Homeowner if they haven't done their septic cleaning, etc. & our permit hinges on <br />that being taken care of 1st. It has nothing to do with that. <br />Average turn -around time has been 7.4 days.....would like to see this reduced to 5 or less if possible. <br />Sometimes it feels like the review process takes longer than it should. That being said, staff has been good about <br />setting expectations so I can plan for the wait. <br />I believe 10 work days ( two weeks) is two long. <br />3/30/2016 10:24 AM <br />3/30/2016 10:24 AM <br />3/30/2016 10:06 AM <br />3/30/2016 9:38 AM <br />3/30/2016 9:03 AM <br />3/30/2016 9:00 AM <br />3/30/2016 8:57 AM <br />3/29/2016 10:29 PM <br />3/29/2016 4:22 PM <br />6/24 <br />