My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/08/1987
Ramsey
>
Public
>
Agendas
>
Council
>
1987
>
Agenda - Council - 12/08/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 1:53:05 PM
Creation date
6/11/2004 8:35:00 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/08/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be proposes to haul the materials, as previously described, <br />and notify the City Engineer as to the road (or roads) so <br />selected. Within 15 calendar days after being notified of <br />the haul road selection, the City Engineer will, if he finds <br />the road (or roads) so selected to be a practicable route, <br />approve that road as a designated haul road. <br /> <br />After a haul road has been officially designated, the <br />Operator may select a different road for official designation <br />under the same conditions as previously stated. However, any <br />changes made in haul road designation shall not relieve the <br />Operator of his obligation of restoring the previously <br />designated haul road if any of the above described materials <br />were hauled over that road. <br /> <br />k~ile hauling operations are in progress, the Operator shall <br />maintain the haul road in a condition satisfactory to the <br />City Engineer. This work shall include application of water, <br />bituminous material, or calcium chloride to the road surface <br />as may be necessary to alleviate dust nuisance and eliminate <br />traffic hazards. <br /> <br />'~rnen hauling operations over any haul road are completed, the <br />Operator shall (at his option): (a) restore that haul road to <br />a condition at least equal to that which existed at the time <br />the hauling operations were started; or (b) compensate the <br />local road authority in an amount satisfactory to that road <br />authority and concurred in by the City Engineer for the <br />restoration of that haul road by the City. <br /> <br />The fact that other traffic has used the haul road <br />concurrently with the hauling of the above described <br />materials shall not relieve the Ooerator of his obligation to <br />maintain and restore the haul roaa as above provided. <br /> <br />?r~e City Engineer's denermination as to the kind and amount <br />of maintenance and restoration work reouired to restore the <br />haul road to a condition e~ual to that wlnich existed at the <br />time the hauling operations were started shall be final, <br />binding and conclusive. <br /> <br />krnen hauling over any designated haul.road has been completed <br />and the Ooeratcr has restored that road or has comoensated <br />for nhat restoration as required, ..the City Engineer will <br />accept such resnoration or c .... ~n such financial <br /> O~ <br /> ~_em for the resnoration cf the ~"~ road (as the case <br />may 'De) in wrining, and such acceptance will relieve the <br />Operator of any. additional obligation in connection with <br />restoration of that road. <br /> <br />If the Ooerator fails or refuses ~o oerform haul road <br />restoration or to make satisfactory financial settlement for <br />such restoration as required wit~i~ the period soecified in a <br />written notice by the Cit7 Engineer, the City will cause the <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.