Laserfiche WebLink
- ll - <br /> <br />After a haul road has been officially designated, the <br />Operator may select a different road for official designation <br />under the same conditions as previously stated. However, any <br />changes made in haul road designation shall not relieve the <br />Operator of his obligation of restoring the previously <br />designated haul road if any of the above described materials <br />were hauled over that road. <br /> <br />While hauling operations are in progress, the Operator shall <br />maintain the haul road in a condition satisfactory to the <br />City Engineer. This work shall include application of water, <br />bituminous material, or calcium chloride to the road surface <br />as may be necessary to alleviate dust nuisance and eliminate <br />traffic hazards. <br /> <br />'When hauling operations over any haul road are completed, the <br />Operator shall (at his option): (a) restore that haul road to <br />a condition at least equal to that which existed at the tim'e <br />the hauling operations were started; or (b) compensate the <br />local road authority in an amount satisfactory to that road <br />authority and concurred in by the City Engineer for the <br />restoration of that haul road by the City. <br /> <br />The fact that other traffic has used the haul road <br />concurrently with the hauling of the above described <br />materials shall not relieve the Operator of his obligation to <br />maintain and restore the haul road as above provided. <br /> <br />The City Engineer's determination as to the kind and amount <br />of maintenance and restoration work required to restore the <br />haul road to a condition equal to that which existed at the <br />time the hauling operations were started shall be final, <br />binding and conclusive. <br /> <br />~r~en hauling over any designated haul road has been completed <br />and the Opera+ ~ has restored that road or has compensated <br />for that restoration as required, the City Engineer will <br />accept such restoration or concur in such financial <br />settlement for the restoration' of the haul road (as the case <br />may be) in ~riting, and such acceptance will relieve the <br /> <br /> ~ ~_ ' ~ ~. ~o~ .... ion the <br />Op£ra~or cfi any. ad~':tiona! ob!~_g~tion '~ ..... t with <br />restoration of that road. <br /> <br />If the Operator fails or refuses to perform haul road <br />restoration or to make satisfactory financial settlement for <br />such restoration as required wi <br /> ~n the period snecified in a <br />written notice by the Cizy Engineer, nhe City wi%l cause the <br />restoration ~ork to be done and require reimbursement <br />therefor from the Ooerator's Surety. <br /> <br />Operators shall obey all state, county and municipal road <br />limits and ~ ~ ' ~-- ~ <br /> o~ne~ applicable_ ~r^ffic~ = regulations ~n ~=~n <br />and from the site. Operators shall also restrict trucks <br />hauling to and from the s~e~_ to ~' ~n~ use oz~ those oub!ia~ <br />h~o~wavs designated b~,, the oermit <br /> <br /> <br />