My WebLink
|
Help
|
About
|
Sign Out
Home
10/20/87 Special
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1987
>
10/20/87 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 8:48:06 AM
Creation date
6/11/2004 9:54:15 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission - Special
Document Date
10/20/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The peaks and depressions of the site shall be graded <br />and backfil!ed to a surface which will result in a <br />gently rolling topography in substantial conformity to <br />the land area immediately surrounding the site and which <br />will minimize erosion due to rainfall. No finished <br />slope shall exceed twelve percent (12%) in grade. <br /> <br />Restoration shall begin after the grading, mining and/or <br />filling of twenty five percent (25%) of the total area <br />to be mined or five (5) acres, whichever is less. Once <br />these areas have been graded, mined or filled, they <br />shall be sloped and seeded as per the restoration plan. <br /> <br />Restored areas shall be surfaced with a soil of a <br />quality at least equal to the topsoil of land areas <br />immediately surrounding the site, and to a depth of at <br />least six (6) inches. ~he topsoil si~all be seeded, <br />sodded, or planted with grasses. Irees and shrubs may <br />also be planted but not as a substitute for grasses. <br />Such planting shall adequately retard soil 'erosion. <br /> <br />The finished grade shall be such that it will not <br />adversely affect the surrounding land or future <br />development of the site and shall be consistent with the <br />end use plan. <br /> <br />Within thirty (30) days after the deposit of approved <br />fill materials, the filled area shall be covered with a <br />minimum of six (6) inches clean fill, and the depth of <br />the fill shall be controlled to blend with the <br />surrounding ground conditions. <br /> <br />I70.017M(12) Existing Operations: <br /> <br />SECTION 2. PZNALTY <br /> <br />z"~'-v ~f a -~=~ezeancr and uoon *~znvicti~,. ~.=li be ~uni£he= by <br /> <br />~ =:-= cf not m~re~ than _,~.~7;~ 00 *r~ imprisonment for~_~~_ ~-=~__ than <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.