Laserfiche WebLink
Plan(CIP)for 2017. However,new public utilities (water supply and sanitary sewer)are not proposed to be <br /> constructed with this project since the CIP does not include any such improvements. <br /> Notification: <br /> No notifications are required for this case. <br /> Observations/Alternatives: <br /> Observations: <br /> The Feasibility Report will explore numerous aspects of the proposed improvements including whether the <br /> proposed improvements are feasible and necessary,whether they are cost-effective, and whether they should be <br /> completed as proposed or in conjunction with some other improvement project. The estimated costs of the proposed <br /> improvements will be explored in more detail, as will a project funding program including a description of the <br /> methodology used to calculate individual assessments for affected parcels. A proposed project schedule will also be <br /> identified. <br /> Completing the Feasibility Report at this time will allow the City to develop the project in a timely manner and to <br /> advertise for bids over the early winter when bidding is typically most competitive. <br /> Alternatives: <br /> Alternative Action#1 —Motion to adopt Resolution#16-08-139 ordering a Feasibility Report for Improvement <br /> Project 417-00,Alpine Drive and Sunwood Drive Reconstructions. <br /> Alternative Action 92—Motion to deny adoption of Resolution 416-08-139 at this time. <br /> Funding Source: <br /> The Feasibility Report will be completed in-house as part of staffs regular duties.Numerous soil borings will be <br /> required to complete the geotechnical evaluation section of the report. This work is estimated to cost$10,000. <br /> The 2016 -2020 CIP includes a 2017 estimated project cost of$793,600 for the reconstruction of Alpine Drive <br /> between Armstrong Boulevard/CSAH 83 and Variolite Street. The segment of Sunwood Drive between Ramsey <br /> Boulevard/CSAH 56 and Bunker Lake Boulevard/CR 116 was originally proposed as a 2016 mill and overlay <br /> project but was pushed out to 2017 due to the reconstruction of Bunker Lake Boulevard between Ramsey <br /> Boulevard and Basalt Street,and to a much lesser degree due to a pending 2016 building expansion project at <br /> Anderson Dahlen. If this segment of Sunwood Drive requires full or partial reconstruction, sufficient bond funds <br /> should be available while not negatively impacting the ability to deliver the remaining street reconstruction projects <br /> programmed through the current 5-year street reconstruction and overlay bonding program. This is due primarily to <br /> the favorable bids the City has recently been receiving for overlay and reconstruction projects. <br /> Special assessments to benefiting properties are proposed to fund up to 25%of eligible project costs for the <br /> proposed improvements,but more so along Sunwood Drive than Alpine Drive. However, Street Reconstruction <br /> Bonds will fund the majority of project costs. Storm Water Funds will pay for storm sewer improvements, and <br /> Utility Enterprise Funds will fund any required utility improvements. Other funding sources will also be explored <br /> within the Feasibility Report. <br /> Recommendation: <br /> Staff recommends selecting Alternative Action 91 to allow the project to be developed in a timely manner in the fall <br /> of 2016,and to be constructed in 2017. Since special assessments are proposed to pay for a portion of the project <br /> costs, a Feasibility Report must be completed to comply with the Chapter 429 process requirements, and to allow <br /> staff to engage with residents and businesses along the corridors as early as possible to avoid project delays. <br /> Action: <br /> Motion to adopt Resolution 916-08-139 ordering a Feasibility Report for Improvement Project 917-00,Alpine <br /> Drive and Sunwood Drive Reconstructions. <br />