Laserfiche WebLink
Joe Brennan <br /> From: Chase Hennessey Echennessey@bkvgroup.com> <br /> Sent: Thursday,April 21, 2016 9:33 AM <br /> To: Joe Brennan <br /> Cc: Brady K. Halverson; Bruce Schwartzman <br /> Subject: RE: Ramsey Fire Station #2 -Irrigation <br /> Follow Up Flag: Follow up <br /> Flag Status: Flagged <br /> Joe, <br /> Brady and 1 discussed the irrigation system.The following is a history breakdown from Brady, our Landscape Architect. <br /> Addendum 1 added the note "Rain Sensors, Soil Moisture Sensors, and Smart Controller shall be included within the <br /> irrigation design"to sheet L100. Looking at the addendum it was mistakenly omitted from the Addendum 1 issue so it <br /> was included with Addendum 2. That's as detailed as the language got, so I don't know if that's a PR or not. Ask <br /> Brennan what controller he was using as his basis for bid. If the controller on which he based his bid meets the criteria <br /> of"Rain Sensors, Soil Moisture Sensors, and Smart Controller"then the upgrade to Acclima SC-24 would justify a PR. <br /> Please clarify what is in your bid and clarify for us if this is equal or an upgraded project. <br /> Chase Ilen(iessey I Construction Administrator 113KV Group 1 Ph:612.373.9533 <br /> 222 North 2""Sircet.Suite 101,Minneapolis.ININ 55 401 1 Chicago. 11, 1 Washington.DC <br /> Architecture,Interior Dnign,Landscal)e Architccturc.Engineering I wwwAygroup.com GOC' <br /> t msider the et,vironnicitt before pritlting aw-3 em nt:ptint onIY if necessary. <br /> From:Joe Brennan [mailto:ioebrennan@bcofmn.coml <br /> Sent:Wednesday,April 20, 2016 6:39 PM <br /> To:Chase Hennessey<chennessey@bkygroup.com> <br /> Cc: Bruce Schwartzman<bschwartzman@bkvgroup.com>;Scott Jones<SJones@bcofmn.com>; Matt Kohner <br /> <Matt.Kohner@fridleymn.gov> <br /> Subject: Ramsey Fire Station#2-Irritation <br /> Hi Chase—I've heard a couple things about mandatory changes to the Ramsey irrigation system. Can you contact Matt <br /> about this,and issue a PR for this if necessary? We should be starting irrigation next week,thanks. <br /> Joe Brennan I Brennan Companies <br /> Project Manager <br /> 124 East Walnut Street, Suite 20 <br /> Mankato, MN 56001 <br /> P 507-625-5417 i C 507-381-3525 i F 507-625-4805 <br /> 1 <br />