Laserfiche WebLink
CC Regular Session 7.2. <br /> Meeting Date: 07/26/2016 <br /> By: Tim Gladhill,Community Development <br /> Information <br /> Title: <br /> Consider Preliminary Plat Approval of COR THREE North Commons; Case of Purmort Homes, Inc. (Project No. <br /> 16-63) <br /> Purpose/Background: <br /> The Planning Commission is reviewing this case on July 21, 2016. The results of that meeting are not available at <br /> time of publishing of this agenda. This agenda will be revised on July 22,2016 to include the results of the <br /> Planning Commission review. <br /> ?The purpose of this case is to consider a recommendation for a Preliminary Plat(Major Plat) for a 13 lot <br /> single-family subdivision located north of Bunker Lake Boulevard. This plat was previously approved by the City; <br /> however organic soil conditions were discovered and this portion of the project was canceled. Four(4)lots <br /> abutting North Commons Park on the east side of Zeolite Street were completed from the original project. <br /> Purmort Homes, Inc.,has applied to complete the remaining thirteen(13)lots and understands the soil correction <br /> needs.Please note that the attached plan set is titled Final Plat. However,the Planning Commission is processing <br /> this plan set as Preliminary Plat. The Developer is simply avoiding preparing multiple plan sets. Staff fmds this <br /> acceptable,as the plan set includes more detail than required at this stage, a benefit to the Planning Commission's <br /> review. <br /> The previous case granting approval of the case is included as background information. <br /> Notification: <br /> Staff attempted to notify all Property Owners within 700 Feet of the Subject Property of the Public Hearing. <br /> Observations/Alternatives: <br /> The proposed lot sizes are generally slightly larger than the existing single-family lots in this district of The COR. <br /> A shared stormwater pond is proposed in the rear yards of the proposed lots. <br /> This project will also trigger the need to complete a regional stormwater improvement on the south side of Bunker <br /> Lake Boulevard. As this is a regional stormwater improvement,it is the responsibility of the City to construct. <br /> These improvements are paid by standard Stormwater Management Fees collected at the time of development, to <br /> which the Developer will contribute. <br /> At the time of publishing of this agenda,no formal opposition is noted. However,the City has received questions <br /> and concerns about availability of parking due to lot size. Additionally, Staff has noted previous perception amongst <br /> existing homeowners that this property was expected to remain undeveloped. It is Staffs understanding that this <br /> parcel had been anticipated for development since the creation of the original Master Plan. The project has been <br /> reviewed by the City Engineer and Public Works Superintendent. The existing roadways are adequately design to <br /> accommodate this development proposal. <br /> Funding Source: <br />