Laserfiche WebLink
no. <br /> Our Mission: To work"ettrer to resposibty grow our community,and to provide quality,cost-effective.and efficient government services. <br /> CC Regular Session 7. 5. <br /> Meeting Date: 07/26/2016 <br /> By: Bruce Westby,Engineering/Public <br /> Works <br /> Information <br /> Title: <br /> Adopt Resolution 416-07-134 Accepting Bids and Awarding Contract for Improvement Project 916-00 Division B, <br /> Mill and Overlay Improvements <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to consider adopting attached Resolution 416-07-134 accepting bids and awarding a <br /> construction contract for Improvement Project 416-00, Division B; 2016 Mill and Overlay Improvements. <br /> Background: <br /> City of Ramsey Improvement Project#16-00 Division B proposes to mill and overlay the existing bituminous <br /> pavement on approximately 0.8 miles of Sunwood Drive between Sunfish Lake Boulevard and the bridge located <br /> between 147h Lane and Krypton Street, along with miscellaneous appurtenant improvements. A copy of the plans <br /> is attached to this case. The title sheet depicts the location and scope of the proposed improvements. <br /> City staff visually inspects each public street segment throughout the City annually to determine pavement <br /> conditions. Staff uses the Pavement and Surface Evaluation Rating(PASER)method to assign a numerical rating <br /> between 1 and 10 to each street segment. Streets with a PASER rating of 1 are considered to need a complete <br /> reconstruction,while streets with a PASER rating of 10 are considered to be new pavement sections. The segment <br /> of Sunwood Drive proposed to receive mill and overlay improvements in 2016 was constructed in 1996,was <br /> sealcoated in 2002 and 2008, and has PASER ratings between 4 and 5 making it a timely candidate for mill and <br /> overlay improvements. The proposed improvements should extend the life of the pavement approximately 20 years, <br /> at which time a second mill and overlay project will likely be proposed. <br /> This segment of Sunwood Drive was constructed with B618 concrete curb and gutter, a storm sewer system, and an <br /> average of 3r/2 inches of bituminous pavement over 4 inches of class 5 aggregate base. The street is 30 feet wide <br /> between Sunfish Lake Boulevard and 145th Lane,and 40 feet wide over the remainder of the segment. The <br /> right-of-way is 80 feet wide throughout the corridor. Sanitary sewer and water supply systems exist throughout the <br /> corridor but both are in good operating condition and are not anticipated to require improvements over the estimated <br /> 20 year design life of the proposed improvements. <br /> Proposed improvements include removing and replacing approximately 200 feet of damaged concrete curb and <br /> gutter,milling 2 inches of bituminous pavement off the top of the existing pavement section and adding 2 inches of <br /> new bituminous pavement on top of the milled base course, and other appurtenant improvements including utility <br /> casting adjustments and upgrading two pedestrian curb ramps where the trail crosses the"eyebrow"north of <br /> Sunwood Drive at the east end of the project. <br /> Notification: <br />