F. No Claim for an adjustment in Contract Price 2. Cost of all materials and equipment
<br /> or Contract Times will be valid if not furnished and incorporated in the Work,
<br /> submitted in accordance with this Paragraph including costs of transportation and
<br /> 10.05. storage thereof, and Suppliers' field
<br /> services required in connection therewith.
<br /> ARTICLE 11—COST OF THE WORK; All cash discounts shall accrue to
<br /> ALLOWANCES;UNIT PRICE WORK Contractor unless Owner deposits funds
<br /> with Contractor with which to make
<br /> 11.01 Cost of the Work payments, in which case the cash
<br /> discounts shall accrue to Owner. All
<br /> A. Costs Included: The term Cost of the Work trade discounts, rebates and refunds and
<br /> means the sum of all costs, except those returns from sale of surplus materials and
<br /> excluded in Paragraph 11.01.13, necessarily equipment shall accrue to Owner, and
<br /> incurred and paid by Contractor in the proper Contractor shall make provisions so that
<br /> performance of the Work. When the value of they may be obtained.
<br /> any Work covered by a Change Order or
<br /> when a Claim for an adjustment in Contract 3. Payments made by Contractor to
<br /> Price is determined on the basis of Cost of the Subcontractors for Work performed by
<br /> Work, the costs to be reimbursed to Subcontractors. If required by Owner,
<br /> Contractor will be only those additional or Contractor shall obtain competitive bids
<br /> incremental costs required because of the from subcontractors acceptable to Owner
<br /> change in the Work or because of the event and Contractor and shall deliver such
<br /> giving rise to the Claim. Except as otherwise bids to Owner, who will then determine,
<br /> may be agreed to in writing by Owner, such with the advice of Engineer, which bids,
<br /> costs shall be in amounts no higher than those if any, will be acceptable. If any
<br /> prevailing in the locality of the Project, shall subcontract provides that the
<br /> include only the following items,and shall not Subcontractor is to be paid on the basis
<br /> include any of the costs itemized in Paragraph of Cost of the Work plus a fee, the
<br /> 11.01.13. Subcontractor's Cost of the Work and fee
<br /> shall be determined in the same manner
<br /> 1. Payroll costs for employees in the direct as Contractor's Cost of the Work and fee
<br /> employ of Contractor in the performance as provided in this Paragraph 11.01.
<br /> of the Work under schedules of job
<br /> classifications agreed upon by Owner and 4. Costs of special consultants (including
<br /> Contractor. Such employees shall but not limited to Engineers, architects,
<br /> include, without limitation, testing laboratories, surveyors, attorneys,
<br /> superintendents, foremen, and other and accountants) employed for services
<br /> personnel employed full time at the Site. specifically related to the Work.
<br /> Payroll costs for employees not
<br /> employed full time on the Work shall be 5. Supplemental costs including the
<br /> apportioned on the basis of their time following:
<br /> spent on the Work. Payroll costs shall
<br /> include,but not be limited to,salaries and a. The proportion of necessary
<br /> wages plus the cost of fringe benefits, transportation, travel, and
<br /> which shall include social security subsistence expenses of Contractor's
<br /> contributions,unemployment,excise,and employees incurred in discharge of
<br /> payroll taxes, workers' compensation, duties connected with the Work.
<br /> health and retirement benefits, bonuses,
<br /> sick leave, vacation and holiday pay b. Cost, including transportation and
<br /> applicable thereto. The expenses of maintenance, of all materials,
<br /> performing Work outside of regular supplies, equipment, machinery,
<br /> working hours, on Saturday, Sunday, or appliances, office, and temporary
<br /> legal holidays, shall be included in the facilities at the Site, and hand tools
<br /> above to the extent authorized by Owner. not owned by the workers,which are
<br /> consumed in the performance of the
<br /> Standard General Conditions
<br /> 00 72 00-33
<br />
|