My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/23/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 08/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:52:06 PM
Creation date
8/22/2016 11:21:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/23/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12.02 Change of Contract Times entitled to an equitable adjustment in Contract <br /> Times, if such adjustment is essential to <br /> A. The Contract Times may only be changed by Contractor's ability to complete the Work <br /> a Change Order.Any Claim for an adjustment within the Contract Times. Such an <br /> in the Contract Times shall be based on adjustment shall be Contractor's sole and <br /> written notice submitted by the party making exclusive remedy for the delays described in <br /> the Claim to the Engineer and the other party this Paragraph 12.03.C. <br /> to the Contract in accordance with the <br /> provisions of Paragraph 10.05. D. Owner, Engineer and the Related Entities of <br /> each of them shall not be liable to Contractor <br /> B. Any adjustment of the Contract Times for any claims, costs, losses, or damages <br /> covered by a Change Order or any Claim for (including but not limited to all fees and <br /> an adjustment in the Contract Times will be charges of Engineers, architects, attorneys, <br /> determined in accordance with the provisions and other professionals and all court or <br /> of this Article 12. arbitration or other dispute resolution costs) <br /> sustained by Contractor on or in connection <br /> 12.03 Delays with any other project or anticipated project. <br /> A. Where Contractor is prevented from E. Contractor shall not be entitled to an <br /> completing any part of the Work within the adjustment in Contract Price or Contract <br /> Contract Times due to delay beyond the Times for delays within the control of <br /> control of Contractor,the Contract Times will Contractor. Delays attributable to and within <br /> be extended in an amount equal to the time the control of a Subcontractor or Supplier <br /> lost due to such delay if a Claim is made shall be deemed to be delays within the <br /> therefor as provided in Paragraph 12.02.A. control of Contractor. <br /> Delays beyond the control of Contractor shall <br /> include, but not be limited to, acts or neglect ARTICLE 13—TESTS AND INSPECTIONS; <br /> by Owner,acts or neglect of utility owners or CORRECTION,REMOVAL OR ACCEPTANCE OF <br /> other contractors performing other work as DEFECTIVE WORK <br /> contemplated by Article 7, fires, floods, <br /> epidemics, abnormal weather conditions, or 13.01 Notice of Defects <br /> acts of God. <br /> A. Prompt notice of all defective Work of which <br /> B. If Owner, Engineer, or other contractors or Owner or Engineer has actual knowledge will <br /> utility owners performing other work for be given to Contractor. All defective Work <br /> Owner as contemplated by Article 7, or may be rejected, corrected, or accepted as <br /> anyone for whom Owner is responsible, provided in this Article 13. <br /> delays, disrupts, or interferes with the <br /> performance or progress of the Work, then 13.02 Access to Work <br /> Contractor shall be entitled to an equitable <br /> adjustment in the Contract Price or the A. Owner, Engineer, their consultants and other <br /> Contract Times, or both. Contractor's representatives and personnel of Owner, <br /> entitlement to an adjustment of the Contract independent testing laboratories, and <br /> Times is conditioned on such adjustment governmental agencies with jurisdictional <br /> being essential to Contractor's ability to interests will have access to the Site and the <br /> complete the Work within the Contract Work at reasonable times for their <br /> Times. observation, inspecting, and testing. <br /> Contractor shall provide them proper and safe <br /> C. If Contractor is delayed in the performance or conditions for such access and advise them of <br /> progress of the Work by fire,flood,epidemic, Contractor's Site safety procedures and <br /> abnormal weather conditions, acts of God, programs so that they may comply therewith <br /> acts or failures to act of utility owners not as applicable. <br /> under the control of Owner, or other causes <br /> not the fault of and beyond control of Owner <br /> and Contractor, then Contractor shall be <br /> Standard General Conditions <br /> 00 72 00-37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.