Contractor may make a Claim therefor as permitted by Laws and Regulations as <br /> provided in Paragraph 10.05. contemplated in Paragraph 6.1 LA is found to <br /> be defective, Contractor shall promptly, <br /> 13.05 Owner May Stop the Work without cost to Owner and in accordance with <br /> Owner's written instructions: <br /> A. If the Work is defective,or Contractor fails to <br /> supply sufficient skilled workers or suitable 1. repair such defective land or areas;or <br /> materials or equipment,or fails to perform the <br /> Work in such a way that the completed Work 2. correct such defective Work;or <br /> will conform to the Contract Documents, <br /> Owner may order Contractor to stop the 3. if the defective Work has been rejected <br /> Work, or any portion thereof, until the cause by Owner,remove it from the Project and <br /> for such order has been eliminated; however, replace it with Work that is not defective, <br /> this right of Owner to stop the Work shall not and <br /> give rise to any duty on the part of Owner to <br /> exercise this right for the benefit of 4. satisfactorily correct or repair or remove <br /> Contractor, any Subcontractor, any Supplier, and replace any damage to other Work, <br /> any other individual or entity, or any surety to the work of others or other land or <br /> for,or employee or agent of any of them. areas resulting therefrom. <br /> 13.06 Correction or Removal of Defective Work B. If Contractor does not promptly comply with <br /> the terms of Owner's written instructions, or <br /> A. Promptly after receipt of notice, Contractor in an emergency where delay would cause <br /> shall correct all defective Work, whether or serious risk of loss or damage, Owner may <br /> not fabricated, installed, or completed, or, if have the defective Work corrected or repaired <br /> the Work has been rejected by Engineer, or may have the rejected Work removed and <br /> remove it from the Project and replace it with replaced. All claims, costs, losses, and <br /> Work that is not defective. Contractor shall damages (including but not limited to all fees <br /> pay all claims, costs, losses, and damages and charges of engineers,architects,attorneys, <br /> (including but not limited to all fees and and other professionals and all court or <br /> charges of engineers,architects,attorneys,and arbitration or other dispute resolution costs) <br /> other professionals and all court or arbitration arising out of or relating to such correction or <br /> or other dispute resolution costs) arising out repair or such removal and replacement <br /> of or relating to such correction or removal (including but not limited to all costs of repair <br /> (including but not limited to all costs of repair or replacement of work of others)will be paid <br /> or replacement of work of others). by Contractor. <br /> B. When correcting defective Work under the C. In special circumstances where a particular <br /> terms of this Paragraph 13.06 or Paragraph item of equipment is placed in continuous <br /> 13.07, Contractor shall take no action that service before Substantial Completion of all <br /> would void or otherwise impair Owner's the Work, the correction period for that item <br /> special warranty and guarantee,if any,on said may start to run from an earlier date if so <br /> Work. provided in the Specifications. <br /> 13.07 Correction Period D. Where defective Work (and damage to other <br /> Work resulting therefrom) has been corrected <br /> A. If within one year after the date of Substantial or removed and replaced under this Paragraph <br /> Completion(or such longer period of time as 13.07, the correction period hereunder with <br /> may be prescribed by the terms of any respect to such Work will be extended for an <br /> applicable special guarantee required by the additional period of one year after such <br /> Contract Documents) or by any specific correction or removal and replacement has <br /> provision of the Contract Documents, any been satisfactorily completed. <br /> Work is found to be defective,or if the repair <br /> of any damages to the land or areas made E. Contractor's obligations under this Paragraph <br /> available for Contractor's use by Owner or 13.07 are in addition to any other obligation <br /> Standard General Conditions <br /> 00 72 00-39 <br />