DOCUMENT 00 73 00 <br /> SUPPLEMENTARY CONDITIONS <br /> These Supplementary Conditions amend or supplement the Standard General Conditions of the Construction Contract (No. C- <br /> 700,2002 Edition)and other provisions of the Contract Documents as indicated below.All provisions which are not so amended <br /> or supplemented remain in full force and effect. <br /> The terms used in these Supplementary Conditions have the meanings stated in the General Conditions.Additional terms used in <br /> these Supplementary Conditions have the meanings stated below,which are applicable to both the singular and plural thereof. <br /> SC-4.02 Add the following new paragraph(s)immediately after Paragraph 4.02.13: <br /> C. In the preparation of Drawings and Specifications,Engineer relied upon the following reports of explorations and tests <br /> of subsurface conditions at the Site: <br /> 1. City Hall&Fire Station Architectural plans by Setter Leach&Lindstrom Inc.,dated July 14, 1977 (Includes 26 <br /> Sheets). <br /> 2. Police Building Architectural Plans prepared by Paul Meyer Architects, dated June 20, 1996 (Includes 9 <br /> Sheets). <br /> 3. Asbestos Survey Report City Building 15153 Nowthen Blvd.Ramsey,MN, dated November 2012,prepare by <br /> Environmental Property Audits,Inc. <br /> 4. Asbestos Survey Report Municipal Building 5240 Helium Street NW Ramsey, MN, dated November 2012, <br /> prepared by Environmental Property Audits,Inc. <br /> SC-4.04 Add the following new paragraph immediately after paragraph 4.04.13: <br /> C. Contractor shall notify"Gopher State One Call" at least 48 hours before starting excavation in accordance with state <br /> laws. <br /> SC-4.05 Delete Paragraphs 4.05.A in its entirety and insert the following: <br /> Engineer shall provide engineering surveys for construction, including alignment and grade,which in Engineer's judgement <br /> are necessary to enable Contractor to proceed with the Work. Contractor shall protect and preserve the established reference <br /> points, property monuments, survey stakes and marks, and shall make no changes or relocations without authorization from <br /> Engineer. The costs incurred in replacement of disturbed or lost reference points,property monuments,or survey stakes and <br /> marks shall be deducted from payments to Contractor in any case where the disturbance or loss is not directly attributed to an <br /> error or act of Engineer. Contractor shall provide Engineer forty-eight(48)hours written notice of the need for survey stakes. <br /> SC-4.06 Delete Paragraphs 4.06.A and 4.06.13 in their entirety and insert the following: <br /> A. No reports or drawings related to Hazardous Environmental Conditions are known to Owner or Engineer. <br /> B. Not Used. <br /> Supplementary Conditions <br /> 00 73 004 <br />