My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/23/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 08/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:52:06 PM
Creation date
8/22/2016 11:21:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/23/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 0133 00 <br /> SUBMITTALS <br /> PART 1—GENERAL <br /> 1.01 SUMMARY <br /> A. This Section includes administrative and procedural requirements for submittals required for performance of the <br /> Work,including the following: <br /> 1. Contractor's construction schedule. <br /> 2. Submittal schedule. <br /> 3. Shop drawings. <br /> 4. Product data. <br /> 5. Samples. <br /> 6. Quality assurance and quality control submittals,including calculations,mix designs and substantiating test <br /> results. <br /> PART 2—PRODUCTS (Not used) <br /> PART 3—EXECUTION <br /> 3.01 SUBMITTAL PROCEDURES <br /> Contractor shall be responsible for the following: <br /> A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. <br /> Transmit each submittal sufficiently in advance of performance of related construction activities to avoid delay. <br /> 1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related <br /> activities that require sequential activity. <br /> 2. Coordinate transmittal of different types of submittals for related elements of the Work so processing will <br /> not be delayed by the need to review submittals or resubmittals concurrently. <br /> a. Engineer reserves the right to withhold action on a submittal requiring coordination with other <br /> submittals until all related submittals are received. <br /> 3. Processing: To avoid the need to delay installation as a result of the time required to process submittals, <br /> allow sufficient time for submittal review,including time for resubmittals. <br /> a. Allow fourteen(14)calendar days for initial review. Allow additional time if the Engineer must delay <br /> processing to permit coordination with subsequent submittals. <br /> b. If an intermediate submittal is necessary,process the same as the initial submittal. <br /> c. Allow fourteen(14)calendar days for processing each resubmittal. <br /> d. No extension of Contract Time will be authorized because of failure to transmit submittals to Engineer <br /> sufficiently in advance of the Work to permit processing. <br /> B. Submittal Preparation: Place a permanent label or title block on each submittal for identification. Indicate the <br /> name of the entity that prepared each submittal on the label or title block. <br /> 1. Provide a space approximately 4 inches by 5 inches on the label or beside the title block on Shop Drawings <br /> to record Contractor's and Engineer's review and approval markings and the action taken. <br /> 2. Include the following information on the label for processing and recording action taken. <br /> a. Project name. <br /> b. Date. <br /> C. Name and address of the Contractor's Engineer. <br /> d. Name and address of the Contractor. <br /> e. Name and address of the subcontractor. <br /> Division 1—General Requirements <br /> DV1-1 <br />