My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/23/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 08/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:52:06 PM
Creation date
8/22/2016 11:21:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/23/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.05 PRODUCT DATA <br /> A. Collect Product Data into a single submittal for each element of construction or system. Product Data includes <br /> printed information,such as manufacturer's installation instructions,catalog cuts,standard color charts,standard <br /> wiring diagrams,applicable certifications and performance curves. Mark each copy to show applicable choices <br /> and options. Where printed Product Data includes information on several products that are not required,mark <br /> copies to indicate the applicable infonnation. <br /> 3.06 SAMPLES <br /> A. Submit full-size, fully fabricated Samples cured and finished when specified and physically identical with the <br /> material or product proposed. Samples include partial sections of manufactured or fabricated components, cuts <br /> or containers of materials,color range sets,and swatches showing color,texture,and pattern. Mount or display <br /> Samples in the manner to facilitate review of qualities indicated. <br /> 3.07 QUALITY ASSURANCE AND QUALITY CONTROL SUBMITTALS <br /> A. Submit quality assurance and quality control submittals, including design data, certifications, manufacturer's <br /> instructions, manufacturer's field reports, materials test results, field testing and inspection reports, and other <br /> quality-control submittals as required under other Sections of the Specifications. <br /> B. Certifications: Where other Sections of the Specifications require certification that a product, material, or <br /> installation complies with specified requirements, submit a certification from the manufacturer or responsible <br /> engineer certifying compliance with specified requirements. <br /> C. Calculations: When required in the technical specification, calculations shall be prepared and signed by a <br /> Professional Engineer registered in the State of Minnesota. <br /> 3.08 ENGINEER/ARCHITECT'S ACTION <br /> A. Except for submittals for the record, or for information where action and return is not required, Engineer will <br /> review each submittal, mark to indicate action taken, and return within the time frame specified in Paragraph <br /> 3.1.A.3. <br /> 1. Compliance with specified characteristics is the Contractor's responsibility. <br /> B. Action Stamp: Engineer will stamp each submittal with a uniform,action stamp. Engineer will mark the stamp <br /> appropriately to indicate the action taken,as follows: <br /> 1. "Reviewed":the Work covered by the submittal may proceed provided it complies with requirements of the <br /> Contract Documents. Final payment depends on that compliance. <br /> 2. "Reviewed with Comments": the Work covered by the submittal may proceed provided it complies with <br /> notations or corrections on the submittal and requirements of the Contract Documents. Final payment <br /> depends on that compliance. <br /> 3. "Revise and Resubmit" or "Rejected": do not proceed with Work covered by the submittal, including <br /> purchasing, fabrication, delivery, or other activity. Revise or prepare a new submittal according to the <br /> notations and resubmit without delay. Repeat if necessary to obtain different action mark. <br /> a. Do not use, or allow others to use, submittals marked "Revise and Resubmit" or "Rejected" at the <br /> Project Site or elsewhere where Work is in progress. <br /> 4. Other Action: Where a submittal is for information,or for record purposes,or for special processing,or for <br /> other activity, the E/A will return the submittal marked "Record Copy", "Action Not Required" or "No <br /> Action Taken." <br /> C. Unsolicited Submittals: The E/A will return unsolicited submittals to the sender without action. <br /> Division 1—General Requirements <br /> DV1-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.