My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/23/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 08/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:52:06 PM
Creation date
8/22/2016 11:21:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/23/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.02 REMOVAL <br /> A. The Contractor shall completely remove the buildings and all of its internal and external components,including <br /> steps,stoops,sidewalks,floors,parking lots,concrete curb and gutter,trees,driveways,footings and trees. <br /> 3.03 UTILITIES <br /> A. Telephone, electric power and other wire services, and gas service pipes will be disconnected by the utility <br /> owners outside the buildings and all fixtures belonging to such utility companies will be removed by them. <br /> Contractor shall remove all other piping and fixtures. <br /> B. The City shall notify the utility companies not less than 10 days prior to any work which will affect their <br /> properties. <br /> 3.04 DISPOSAL OF MATERIALS AND DEBRIS <br /> A. All materials removed and all debris resulting from the removal operations, shall become the property of the <br /> Contractor and shall be disposed of in accordance with all City,Federal and State Laws and regulations. <br /> 3.05 SITE RESTORATION <br /> A. After completion of demolition and removal,the site shall be restored to a safe,stable condition. <br /> B. Depressions from all removals shall be backfilled, compacted and graded using on-site soils as fill material in <br /> accordance with Section 2122 00. <br /> C. Final graded slopes shall not exceed 3h:Iv. <br /> D. Vegetation shall be established according to Section 32 92 00. <br /> 3.06 METHOD OF MEASUREMENT <br /> A. Building Demolition and Removal including removal of all interior and exterior materials as described above <br /> will be measured as a single lump sum quantity. <br /> 3.07 METHOD OF PAYMENT <br /> Payment for the Building Demolition and Removal item at the Contract lump sum price shall be compensation for <br /> all costs of the work described above. <br /> Payment for building removal will be made on the basis of the following schedule: <br /> Item Unit <br /> Building Demolition and Removal Lump Sum <br /> END OF SECTION <br /> Division 2—Existing Conditions <br /> DV2-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.