My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/23/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 08/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:52:06 PM
Creation date
8/22/2016 11:21:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/23/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 3114 13 <br /> TOPSOIL STRIPPING AND STOCKPILING <br /> PART 1—GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. This work consists of salvaging and stockpiling topsoil and excavating suitable topsoil from stockpiles to place <br /> on designated areas. <br /> 1.02 RELATED SECTIONS <br /> A. The following is a list of SPECIFICATIONS which may be related to this section: <br /> 1. Section 3122 00 Grading. <br /> 2. Section 3125 00 Erosion and Sedimentation Controls. <br /> PART2-PRODUCTS <br /> 2.01 MATERIALS <br /> A. Topsoil shall consist of natural onsite ground cover. <br /> B. Erosion and Sedimentation Control for Stockpiles shall meet the requirements of Section 3125 00, Erosion and <br /> Sedimentation control. <br /> PART 3-EXECUTION <br /> 3.01 TOPSOIL <br /> A. Topsoil within the limits of the PROJECT shall be salvaged prior to beginning excavating, fill or hauling, <br /> operations by excavating topsoil and stockpiling the material for later use. <br /> 3.02 STOCKPILE <br /> A. No soil stockpile shall exceed ten(10)feet in height. <br /> B. All topsoil stockpiles shall be protected from sediment transport by surface roughening, watering, and <br /> perimeter silt fencing. <br /> C. Any topsoil stockpile remaining longer than 7 days shall be seeded with temporary cover or the approved <br /> specified final seed mixture. <br /> D. Upon completion of PROJECT. Grade stockpile area as necessary for planting or seeding. <br /> END OF SECTION <br /> Division 31—Earthwork <br /> DV31-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.