Laserfiche WebLink
L Near plants spread topsoil manually to prevent damage. <br /> J. Fine grade topsoil to eliminate uneven areas and low spots. Maintain profiles and contour of subgrade. <br /> 3.07 TOLERANCES <br /> A. Top Surface of Subgrade: Plus or minus 1/10 foot from required elevation. <br /> B. Top Surface of Finish Grade: Plus or minus 1/2 inch. <br /> 3.08 CLEANING AND PROTECTION <br /> A. Remove unused stockpiled topsoil and subsoil. Grade stockpile area to prevent standing water. <br /> B. Leave site clean and raked, ready to receive landscaping. <br /> 3.09 METHOD OF MEASUREMENT <br /> A. The Owner will measure Common Excavation by Excavated Volume(EV)as defined in MnDOT <br /> Specification 1901 "Measurement of Quantities" <br /> END OF SECTION <br /> Division 31—Earthwork <br /> DV314 <br />