Laserfiche WebLink
3.03 APPLYING MULCH <br /> A. Mulch shall be applied in accordance with Mn/DOT Specification 2575.3F. <br /> B. Mulch shall be disc-anchored in place. <br /> C. Anchoring equipment shall be operated in a general direction at a right angle to direction of surface drainage. <br /> D. All mulch shall be anchored on same day that it is placed. <br /> 3.04 MAINTENANCE <br /> A. Seed areas shall be maintained by Contractor until acceptance by Engineer,including repair of eroded areas. <br /> B. Areas where seed does not grow shall be reseeded and mulched by Contractor at no additional expense to the <br /> Owner. <br /> 3.05 METHOD OF MEASUREMENT <br /> A. Turf establishment shall be measured by the Lump Sum. <br /> END OF SECTION <br /> Division 32—Exterior Improvements <br /> DV32-2 <br />