My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/23/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 08/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:52:06 PM
Creation date
8/22/2016 11:21:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/23/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Patrick Brama <br /> January 26, 2016 <br /> Page 2 <br /> PREPARE BIDDING DOCUMENTS FOR DEMOLITION <br /> Hakanson Anderson will prepare bidding documents for the building and parking lot demolition. The <br /> project will include demolition and removal of all remaining components of the buildings, demolition <br /> of the parking lot, site grading, and restoration. Removal of the foundation damp proofing (contains <br /> asbestos)will also be included under this contract as it will be necessary for the Contractor to excavate <br /> along the foundation. <br /> Our services will include reviewing the available information, preparing plans to define the removal <br /> limits,preparing the erosion and sediment control plan,preparing the project specifications, estimating <br /> quantities, preparing the bid proposal, and preparing the restoration plan. We will perform limited <br /> topographic survey to estimate the amount of fill required to provide an acceptable slope in the locations <br /> of the existing buildings. We will determine the storm sewer and other utilities that will be removed <br /> under this contract. We will also identify the existing utilities that must be protected during the project, <br /> such as the water and sewer mains that dissect the property. <br /> BIDDING <br /> Hakanson Anderson will assist the City in preparing and submitting the Advertisement for Bids as <br /> required by MN statutes. During the bidding period,we will answer Contractor questions as necessary. <br /> Hakanson Anderson and City staff will conduct two mandatory pre-bid meetings with interested <br /> bidders. The bidders will have the opportunity to tour and inspect the buildings and the site prior to <br /> submitting their bid. We will attend and assist the City in conducting the bid opening. After the bid <br /> opening, we will prepare a bid tabulation to verify that the bid amounts agree with the estimated <br /> quantities and unit prices and prepare a written recommendation for award of the contract. <br /> PERMIT APPLICATIONS <br /> We will complete the Storm Water Pollution Prevention Plan (SWPPP) as required for the NPDES <br /> Construction Permit. The contract will require that the Contractor pay the permit fee and obtain the <br /> permit. No other permit applications have been considered in this proposal. <br /> MEETINGS <br /> We will attend progress meetings with City staff during the preparation of the bidding documents as <br /> necessary. We will also attend and assist the City in conducting the pre-construction conference(s). <br /> CONSTRUCTION PHASE SERVICES <br /> It is anticipated that City staff will perform most of the construction phase services. However, <br /> Hakanson Anderson will be available as needed to answer questions during construction,mark removal <br /> limits or perform other activities upon request. <br /> ]Hakanson <br /> Anderson <br />
The URL can be used to link to this page
Your browser does not support the video tag.