My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/22/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 06/22/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:27:38 PM
Creation date
6/18/2004 3:06:05 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/22/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE: <br /> <br />AWARD BIDS FOR ELMCREST PARK IMPROVEMENTS <br /> By: Leonard Linton, Civil Engineer <br /> <br />Background: <br /> <br />The city council authorized the solicitation of bids for Elmcrest Park Improvements <br />(Improvement Project 04-20) on May 11, 2004. Bids were opened on June 18, 2004. <br />The preliminary results of the bidding are summarized below: <br /> <br />Bidder <br /> <br />Bauerly Companies <br />Dave Perkins Contracting, Inc. <br />Universal Enterprises of Mid-MN, Inc. <br />North Valley, Inc. <br />Forest Lake Contracting, Inc. <br />W. B. Miller, Inc. <br />S.R. Weidema, Inc. <br />Northwest Asphalt <br /> <br />Base BidS Total of Base <br /> and Alternate $ <br />616,291.66 813,305.96 <br />707,597.50 921,960.00 <br />702,376.47 941,867.97 <br />716,386.13 941,970.63 <br />726,073.00 942,696.00 <br />779,186.75 1,037,026.75 <br />851 ,'.166.50 1,125,414.00 <br />797,977.98 1,047,918.10 <br /> <br />Engineers Estimate <br /> <br />711,035.00 907,263.00 <br /> <br />These are the preliminary bid results, the tabulation will be completed after the council <br />agendas are distributed. Verified bid results will be available from staff before the council <br />meeting. <br /> <br />The City Council directed that the project be bid as a base bid plus alternates. This was <br />as a potential cost saving measure to allow construction of parking lots and some trails in <br />the event that the bids for total construction were exceeded available funding. The total <br />plus alternate does exceed the amount identified in the 2004 CIP program, however <br />construction of the full project will not exhaust all of the available park monies in the <br />50% Park fund that can be used city wide. <br /> <br />Funding Sources: <br /> <br />Elmcrest Park Improvements were included in the CI? for 2004 construction. The CF <br />also included a project to extend Quicksilver Street from the existing cul-de-sac to the <br />park. This park is in the Oak Park Recreation District. <br /> <br />CF Elmcrest Park In~provements 2003 <br />CF Elmcrest Park Improvements 2004 <br /> <br />$ 40,000 <br />$ 360,000 <br /> <br />-139- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.