My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/22/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 06/22/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:27:38 PM
Creation date
6/18/2004 3:06:05 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/22/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2) Park and Ride <br /> <br />Assistant Public Works Director Olson reviewed that the City was given a verbal by MnDOT <br />that they had funding and they could start design of the southeast corner of the Park and Ride <br />site. MnDOT had operated the facilities and they disbursed the grants. Northstar Corridor <br />Development Authority is now operating the rail. MnDOT is still releasing the ~ants, and a new <br />employee has suggested the City complete a formal application for the funding they have already <br />received. A previous consent agenda authorized the release of that application. It has not yet <br />been submitted as the City Attorney is going over the legal .jargon to be sure the City does not <br />jeopardize the funding they were told they could carry over. There has not been a design <br />initiated, other than a schematic layout. He reviewed the schematic layout and explained the <br />theater will have to be moved over, and there has been a lot of discussion regarding the centering <br />and frontage of the theater and City Hall. There has not been anything finalized as it relates to <br />financing for both parking structures, as they have been waiting for agreement on the finalization. <br /> <br />Assistant Public Works Director Olson explained the desig, n process should begin very soon. An <br />update to an environmental document that was approved with the Northwest Corridor Park and <br />Ride lot has been done. Approval was received from MnDOT that this can be included in the <br />package for the grant application for the station. They have also received a verbal that there <br />could be an additional $400,000 to $500,000 of additional funding available for surface <br />construction. Staff is assuming that surface construction is for the surface of the deck. They are <br />about 1.5 million dollars short on funding for the complete parking structure. The thought is if <br />and when City Hall gets approved there would be 1.3 million dollars worth of structured parking <br />necessary for employee parking for City Hall with 130 spaces. They are close to being able to <br />build three, if not four layers to begin with. <br /> <br />Councilmember Cook suggested the ramp could be built at five stories instead of four stories, <br />which would only require about ten more parking spaces per floor for an 800-stall ramp. <br /> <br />Assistant Public Works Director Olson replied there has been a lot of discussion about the height <br />of the parking structure. The thought process is they do not want the ramp to be so much bigger <br />than the City Hall, which wii1 be right next to it. He noted that was also a concern of this <br />Cotmcil. <br /> <br />Councilmember Elvig inquired about the additional $400,000 to $500,000 in funding that was <br />mentioned, and what other ~ants are available. <br /> <br />Assistant Public Works Director Olson replied there is 2.2 million dollars available for the <br />Livable Communities Grant, and it has been indicated there is a verbal a~eement for an <br />additional $400,000 in funding. <br /> <br />Councilmember Kurak questioned how much additional area is needed to accommodate a bigger <br />parking ramp and how that will impact the entire development. <br /> <br />Assistant Public Works Director Olson replied he is not overly concerned that it will be difficult <br />to negotiate for the additional land, there will only be an additional 50 or 60 feet needed. <br /> <br />City Council Work Session/June 1, 2004 <br /> Page 3 of 8 <br /> <br />-15- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.