Laserfiche WebLink
17. <br /> <br />18. <br /> <br />19. <br /> <br /> Jess than 2%, a certificate of grading, prepared by a licensed (State of Mirmesota), <br /> professional land surveyor, must be provided to the City documenting that the flattest grade <br /> on this lot is 1% or ~eater will require certificates of gTading; and (d)bg~.devard sod and <br /> landscape tree, or escrow for same, have been provided. :' ~.:i~ . <br /> <br /> SECTION IV .... :;.:'~:i~.;!~ <br /> PARK DEDICATION ::= ' .... <br /> <br />16. Cash Contribution. The Alpine Woods Plat is locat&l in '{1~'~, Nature View <br /> District. Park dedication requirements shall be sari'Stied by a cash payment. The Plat is'i:?';:' <br /> creating 26 lots, which equates to a cash paymen:t; of $5'/,200 (26 lots x $2,200/lo0. <br /> payment shall be made to the City prior to the r, elease of the Final Plat for recording. <br /> <br /> SECTION V <br /> TRANSPORTATION AND LANDSCAPING <br /> <br /> Trail Development And Fees: .:The City Council has enacted:i-5'trail ..deVelopment fee in the <br /> amount of Four Hundred Seventy Fi~e Dollars and no cents ($475:.0:0'~ per unit. Therefore, a <br /> payment, in the amount, Of'Twelve "Thousand Three Hundred~ Eiifty Dollars and no cents <br /> ($12,350.00) (26 lots x' $475/lO0 shall be paid to the CITY pti:or to releasing the Plat for <br /> recording..::::~ <br /> · ..: :;'::::,' !;" <br /> Sidewalk Construction. The DEVELOPER shall c6~Struct and pave, in accordance with <br /> CITY standards, a five (5) foot wide';~0ncrete sidewalk with pedestrian ramps in locations <br /> prescribed .by the' CITY, not to exceed 5%. Sidewalk construction wilI occur along <br /> Vanadium Street, Uranium Street, and:: 155"'..Avenue. The costs associated with sidewalk <br /> construction are not:eti~ble as a credk.,to~ards the Trail Development Fees and/or Park <br /> Dedication requirements due on the Plat: ?' <br /> <br /> Tree, Shrub and Sod Planting Plan. The addition of trees, shrubs and sod to the Plat shall <br /> be in accordance with-the..approved Landscap~ Plan prepared by Passe EngSneering, dated <br /> April 27, 2004, and the Tree Plan .prepared by Passe Engineering, dated March 31, 2004. <br /> The trees to be protected during construction must be identified on the gTading plan, and the <br /> plan must require the inStallation of 'tree save fences' prior to land cleanng or.gading. In <br /> addition, the requirement for this Plan shall be fulfilled by the DEVELOPER as follows: <br /> <br /> a) Minimizing the impact of construction on trees in accordance with Minnesota <br /> Extension Service publication "Protecting Trees From Construction Damage" <br /> (Publication #NR~FO-6135-S). <br /> <br />b) <br /> <br />For trees intended to be planted between the sidewalk and the street, the specific <br />locations must be staked in advance of planting and approved by. the CITY. In the <br />event the weather is not conducive to tree or planting sod in the boulevard at the time <br />of Certificate of Occupancy, the Building Permit holder shall place a cash deposit in <br />the amount of $300.00 for trees and $300.00 for sod in an escrow account with the <br />CITY and upon verification of the planting being accomplished, said cash deposit <br /> <br /> ,4lpine Woods Subdivision <br /> Development ..4 greement <br /> Page 8 of 12 <br /> <br />-293- <br /> <br /> <br />