My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/22/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 06/22/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:27:38 PM
Creation date
6/18/2004 3:06:05 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/22/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACCEPT CHANGE ORDER TO GLEN REHBEIN COMPANIES FOR <br />SUNWOOD DRIVE NW AND RHINESTONE STREET NW IMPROVEMENT <br />PROJECT 03-29 <br /> By: Leonard Linton, Civil Engineer <br /> <br />Background: <br /> <br />This project was authorized for construction of MSA Streets in Ramsey Town Center. ' <br />The work includes extension of trunk sanitary through the Ramsey Town Center Project. <br />The sanitary sewer pipe to be installed is 30". The pipe was connected to the existing <br />system on the west side of Ramsey Boulevard at 143~d Avenue. The existing'line is 27". <br />This was known and it was planned that the line would need to be changed to 30" pipe in <br />the future. Inspection of the line under Ramsey Boulevard indicated that the pipe had a <br />6" sag between manholes. <br /> <br />Ramsey Boulevard will be reconstructed in 2005. The contractor had to dewater to install <br />the new pipe for Ramsey Town Center that connects to the existing manhole. The <br />contractor has the equipment and pipe onsite at this time. It seems logical to replace the <br />pipe under Ramsey Boulevard now while the contractor is onsite and before the street is <br />reconstructed rather than come back and dewater in 2005 for a short length of pipe. There <br />is additional 27" pipe on the east side of Ramsey Boulevard that will need to be replaced <br />in the future. Replacing this section of pipe now will eliminate the need to dig into the <br />newly reconstructed street. <br /> <br />The Public Works Committee reviewed this item at their meeting June 15, 2004. They <br />recommended forwarding this to the City Council for approval. <br /> <br />Recommendation: <br /> <br />Staff recommends approval of Change Order #1 to Project 03-29. <br /> <br />Action: <br /> <br />Motion to approve Change Order #1 to Improvement Project #03-29 in the amount of <br />$16,847.20 made by , seconded by The following <br />voted in favor thereof: <br /> <br />and the following voted against the same: <br /> <br />-323- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.