My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/22/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 06/22/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:27:38 PM
Creation date
6/18/2004 3:06:05 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/22/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pay ESTII~IATE NO. 1 <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br /> <br />CONTRACTOR <br /> <br />Bid Schedule "B" - Ramsey Loc:ti Funding Sunwood Drive NW <br /> <br /> ITEM ITEM QTY UNIT UNIT COST CONTRACT USED TO- EXTENSION <br /> NO. AMOUNT. DATE <br /> 90 REMOVE OR ABANDON PIPE CULVERTS 150 LF $4.13 $619.50 $0.00 <br /> 91 REMOVE BITUMINOUS PAVEMENT 10900 SY $1.35 $14,715.0¢ $0.00 <br /> 92 REMOVE EXISTING SANITARY SEWER MANHOLE I EACH $661.10 $661.1C 1 $661.10 <br /> 93 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 880 LF $0.93 $818.40 $0.00 <br /> 94 SALVAGE 8" DUCTILE IRON PIPE 80 LF $4.13 $330.40 $0.00 <br /> 95 SALVAGE 8" X 8" X 8" DIP TEE I EACH $100.00 $100.0~ $0.00 <br /> 96 SALVAGE DIP PLUGS 3 EACH $25.00 $75.00 $0.00 <br /> 97 COMMON EXCAVATION, EV 10000 CY $2.30 $23,000.0C $0.00 <br /> 98 SALVAGED TOPSOIL FROM STOCKPILE, SV 1200 CY $6.60 $7,920.0C $0.00 <br /> 99 SALVAGE AND REINSTALL AGGREGATE SURFACE (LV) 1320 CY $8.88 $11,721.6C $0.00 <br /> 100 AGGREGATE BASE CLASS 5 MODIFIED 2100 TON $9.06 $19,026.0C $0.00 <br /> t01 VI'ILL BITUMINOUS SURFACE (1.5") 25 SY $258.00 $6,450.0C $0.00 <br /> 102 TYPE MV3 WEARING COURSE MIXTURE 1600 TON $37.00 $59,200.0C $0.00 <br /> 103 TYPE MV3 NON-WEARING COURSE MIXTURE 4650 TON $35.24 $163,866.0C $0.00 <br /> <br />o4sBITUMINOUS MATERIAL FOR TACK COAT 700 GAL $2.17 $1,519.0C $0.00 <br /> <br /> 105 4" DUCTILE IRON PIPE CLASS 53 640 LF $11.35 $7,264.0C $0.00 <br /> 106 6" DUCTILE IRON PIPE CLASS 53 350 LF $11.73 $4,105.5C $0.00 <br /> 107 8" DUCTILE IRON PiPE CLASS 52 1200 LF $14.73 $17,676.0£ $0.00 <br /> 108 12" DUCTILE IRON PIPE CLASS 52 9600 LF $21.77 $208,992.0( $0.00 <br /> 109 8" SDR 26 PVC PIPE (10-12') 380 LF $9.33 $3,545.4( $0.00 <br /> 110 8" SDR26 PVC PII'E(12-14') 240 LF $9.68 $2,323.2( $0.00 <br /> 1 l 1 8" SDR 26 PVC PIPE (14-16') 100 LF $10.52 $1,052.0( 45 $473.40 <br /> 112 8" SDR 26 PVC PIPE (16-18') 100 LF $11.68 $1,168.0( $0.00 <br /> 113 12" SDR 26 PVC t'IPE (10-12') 60 LF $15.44 $926.4C $0.00 <br /> 114 15" SDR 26 PVC I'IPE (12-14') 52 LF $19.04 $990.0~ $0.00 <br /> 115 18" SDR 26 PVC PIPE (10-12') 110 LF $26.79 $2,946.90' $0.00 <br /> 116 18" SDR 26 PVC PIPE (12-14') 170 LF $27.24 $4,630.80 $0.00 <br /> 117 18" SDR 26 PVC PIPE (14-16') 40 LF $26.60 $1,064.00 $0.00 <br /> 118 8" SDR 26 PVC PIPE (l 6-18') 200 LF 227.04 $5,408.00 $0.00 <br /> 119 18" SDR 26 PVC PiPE (18-20') 380 LF $27.55 $10,469.00 $0.00 <br /> 120 18" SDR 26 PVC PIPE (20-22') 20 LF $28.16 $563.20 $0.00 <br /> <br /> 121 30" C905 PVC SDR-25 I'IPE (8-10') 630 LF $89.47 $56,366.10 $0.001 <br /> <br />G:lSharedDocslMun[cipallARamseyl <br />3171/ra3175pe.xlsPAY ESTIMATE NO. I <br /> <br />PE-4 <br /> <br />Rev. 4/14/04 <br /> -'/5- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.