My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/22/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 06/22/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:27:38 PM
Creation date
6/18/2004 3:06:05 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/22/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAY ESTIMATE NO. 1 <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br /> <br />CONTRACTOR <br /> <br />Bid Schedule "C" - S.A.P. 199-109-01 - Rhinestone Street NW Continued <br /> <br /> ITEM ITEM QTY UNIT UNIT COST C(~NTRAC'T USED TO- EXTENSION <br /> NO. AMOUNT DATE <br /> 213 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 49 LF $144.55 $7,082.95 $0.00 <br /> 214 CONSTRUCT DRAINAGE STRUCTURE DESIGN 54- 4020 11 LF $202.58 $2,228.38 $0.00 <br /> 215 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60- 4020. 10 LF $240.94 $2,409.4C $0.00 <br /> 216 CONSTRUCT DRAINAGE STRUCTURE DESIGN 66 - 4020 8 LF $284.46 $2,275.68 $0.00 <br /> 217 CONSTRUCT DRAINAGE STRUCTURE DESIGN 72 - 4020 12 LF $355.03 $4,260.36 $0.00 <br /> <br /> 218 CONSTRUCT DRAINAGE STRUCTURE DESIGN 78 - 4020 19 LF $354.94 $6,743.86 $0.00 <br /> <br />219 CONSTRUCT DRAINAGE STRUCTURE DESIGN 84 - 4020 7 LF $456.75 $3,197.25 $0.00 <br />220 CONSTRUCT DRAINAGE STRUCTURE DESIGN 96 - 4020 40 LF $544.76 $21,790.4C $0.00 <br />221 CASTING ASSEMBLIES SPECIAL 30 EACH $479:25 $14,377.512 $0.00 <br />222 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL I 6 EACH $376.58 $2,259.48 $0.00 <br />223 4" CONCRETE WALK 23000 SF $2.01 $46,230.012 $0.00 <br />224 6" CONCRETE WALK 2500 SF $4.33 $10,825.012 $0.00 <br />225 CONCRETE CURl3 AND GUTTER DESIGN B618 2430 LF $7.59 $18,443.713 $0.00 <br />226 PEDESTRIAN CURB RAMP 24 EACH $319.92 $7,678.08 $0.00 <br />_ 227 SIGN PANELS TYPE C 188.5 SF $22.19 $4,182.82 $0.00 <br />1~28 PAVEMENT MESSAGE (ONLY) EPOXY 4 EACH $200.00 $800.00 $0.00 <br /> <br /> 229 PAVEMENT MESSAGE (RIGHT ARROW) EPOXY 3 EACH $144.48 $433.44 $0.00 <br /> 230 PAVEMENT MESSAGE (LEFT ARROW) EPOXY 5 EACH $144.48 $722.40 $0.00 <br /> 231 F & l SIGN PANELS TYPE "D" 3 EACH $258.00 $774.00 $0.00 <br /> 232 4" SOLID LINE WHITE - PAINT 1850 LF $0.41 $758.50 $0.00 <br /> 233 24" SOLID LINEWHITE- PAINT 20 LF $3.87 $77.40 $0.00 <br /> 234 36" SOLID LINE WItlTE - PAINT 510 LF, - · $5.68 $284.00 $0.00 <br /> 235 4" BROKEN LINE YELLOW- PAINT 150 LF $0.42 $63.00 $0.00 <br /> 236 4" DOUBLE SOLID LINE YELLOW - PAINT 1150 LF $0.85 $977.50 $0.00 <br /> 237 24" SOLID LINE YELLOW- PAINT - 180 LF $2.58 $464.40 $0.00 <br /> 238 4" SOLID LINE WHITE- EPOXY 4100 LF $0.50 $2,050.012 $0.00 <br /> 239 24" STOP LINE WHITE - EPOXY 300 LF $7.22 $2,166.012 $0.00 <br /> 240 36" SOLID LINE WttlTE - EPOXY 570 LF $8.67 $4,941.912 $0.00 <br /> 241 4" BROKEN LINE YELLOW - EPOXY 1800 LF $0.51 $918.012 $0.00 <br /> 242 4" DOUBLE SOLID LINE YELLOW - EPOXY 600 LF $1.01 $606.012 $0.00 <br /> 243 24" SOLID LINE YELLOW - EPOXY 50 LF $5.68 $284.012 $0.00 <br /> 244 INSTALL 4"-6" PVC (SCH 40) CONDUIT 1000 LF $6.45 $6,450.0C $0.00 <br /> <br />G:lSharedDocslMunicipallARamseyl <br />31711ra3171pe.xlsPAY ESTIMATE NO. 1 <br /> <br />PE-8 <br /> <br />Rev. 4/14/04 <br /> -'70- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.