My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 07/21/2016
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2016
>
Agenda - Planning Commission - 07/21/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:25:39 AM
Creation date
8/26/2016 4:41:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
07/21/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
development or redevelopment, will not be acceptable in the future or will be replaced in the future by <br />a permitted or conditional use allowed within the respective district; <br />3) To allow a use that is seasonal in nature; or <br />4) To allow a use for a limited period of time that reasonably uses the property where it is not <br />reasonable to use it in the manner otherwise provided in the zoning ordinance or comprehensive plan. <br />2. Permit Required. <br />It is unlawful to use any structure or land for any purpose requiring an interim use permit in the zoning <br />district in which the property is located without first obtaining an interim use permit from the <br />city. Where applicable, a building permit must also be obtained from the city. <br />3. Application. <br />An application for an interim use permit must comply with the provisions for a conditional use permit <br />application in section 300.06, subdivision 2, and in addition, must contain the following: <br />a) written documentation that includes a complete description of the use, schedule for <br />commencement and termination of the use, hours and dates of operation and anticipated employment, <br />b) site plan drawn to scale showing parcel and existing topography; <br />c) location of all buildings and the size of each, including square footage; <br />d) curb cuts, driveways, access roads, parking spaces, off-street loading areas, and sidewalks; <br />e) natural features such as woodlands, wetlands, shorelines, etc; <br />f) landscaping and screening plans, including species and size of trees and shrubs proposed; <br />g) proposed finished grading and drainage plan sufficient to drain and dispose of all surface water <br />accumulated; <br />h) proposed floor plan and elevations of any building with use indicated; <br />i) proposed outdoor storage spaces (if applicable); and <br />j) any special studies requested by the city planner when there is evidence that the proposed use may <br />negatively impact public infrastructure, the environment or adjacent land uses. These studies may <br />examine the impacts on such things as traffic environment, wetlands, and utilities. <br />4. Procedure. <br />An interim use application will be processed in accordance with the procedure for conditional use <br />permits in section 300.06, subd. 3 and 4. No application for an interim use permit that has been denied <br />wholly or in part may be resubmitted for a period of one year after the date of denial, except on <br />grounds of new evidence or proof of changes of conditions found to be valid by the city council. <br />5. General Standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.