Laserfiche WebLink
Preliminary Plat and Site Plan Review: COR THREE <br />June 15, 2012 <br />Page 5 of 9 <br />10. Public Streets: The development project will be served by existing public streets constructed as part <br />of the Ramsey Town Center 8th, 9`'', and 10th Additions. The streets will need to be open cut to install <br />the utility services. The pavement section shall be restored with 4" Class 5 modified aggregate, 2" <br />bituminous base course and 1 `/" bituminous wear course. This is different than the pavement <br />section listed on the plans. <br />Notification must be provided 48 hours prior to closing the streets for utility installation. Installation <br />of the utility services for Lot 4, Block 2 will require a bypass lane for residents and emergency <br />vehicles while the street is closed. <br />The location of underground utilities, electric, gas, telephone and cable must be shown on the plans. <br />The location of existing sewer and water services must be shown on the plans. <br />11. Grading and Drainage: Staff has received a grading and drainage plan for the development and has <br />the following comments: <br />• Benchmarks are shown on the cover sheet. They are located south of Sunwood Drive. <br />Benchmarks north of Bunker Lake Boulevard must be provided. <br />• Grading limits must be shown on the plans. The topsoil test plots and community garden <br />locations must also be shown. <br />• The plans call for scraping the streets at the end of each day. This shall be replaced with <br />sweeping the streets, scraping the soil off the street is not an acceptable Best Management <br />Practice in the City. <br />• The walkout elevations and garage floor elevations should be adjusted so that the garage <br />elevation is adjacent to the garage. <br />• The NPDES summary on the grading page does not reflect the proposed impervious cover on the <br />site. <br />• We estimate the proposed impervious cover is close to 1 acre, not 0.07 acres. <br />• The normal and high water elevations of the pond must be shown on the plans. <br />• The lowest opening elevations for Lots 1 — 4, Block 2 must be re-evaluated as noted in the <br />Stormwater Analysis section. <br />• Please provide the proposed function of the low area on the west part of Lot 1, Block 1. It <br />appears to be a small ponding area; however, it is not protected with drainage and utility <br />easements. <br />• Dewatering will most likely be needed to construct the pond since the bottom is below the <br />wetlands on adjoining properties. <br />12. Stormwater Analysis: The following comments must be addressed: <br />Stormwater rate control is provided by regional ponding in the COR. The stormwater management <br />plan for the COR requires water quality treatment for the first 1" of runoff from each site. The <br />stormwater narrative submitted with the plans indicated a P8 model was prepared for the site and <br />results from this model demonstrate the water quality goals are met. The P8 model results must be <br />submitted to substantiate this statement. <br />The dead storage volume of the pond must be included in the Hydrocad model. <br />