My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 06/02/2016
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2016
>
Agenda - Economic Development Authority - 06/02/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:31:17 PM
Creation date
8/30/2016 11:38:06 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
06/02/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSB <br /> &&Assoc- Engineering ■ Planning ■ Environmental ■ Construction 701 Xenia Avenue South <br /> Suite 300 <br /> Minneapolis,MN 55416 <br /> Tel: 763-541-4800 <br /> Fax: 763-541-1700 <br /> May 26, 2016 <br /> Patrick Brama <br /> Assistant City Administrator <br /> City of Ramsey <br /> 7550 Sunwood Drive NW <br /> Ramsey, Minnesota 55303 <br /> Re: Shovel Ready Certification Ramsey Sites <br /> Dear Mr. Brama: <br /> We appreciate the opportunity to provide this proposal related to the compiling and completion of the <br /> information required for the Shovel Ready Certification for the sites in the City of Ramsey. The following <br /> represents our understanding of the scope of work requested. <br /> The parcels identified on the attached map as parcel number 37, 42, 45,46, 47,48, 50, 51, 52, 53 have <br /> been reviewed for the information that is currently available for the shovel ready program. In addition, <br /> the future biz park has also been reviewed to determine what additional work would be required for the <br /> park to be certified. Upon the review of the existing information the attached spreadsheet was created <br /> to identify the outstanding items and the estimated costs associated with completing those items. <br /> These estimates are based upon the information that was available and does not include any field work <br /> which if authorize will be completed in the next phase of the project. <br /> If the information that is currently available through sources is incorrect, the costs of some of the items <br /> could increase however based upon the relatively recent completion of the plat for the Ramsey COR it is <br /> anticipated that most of the field information is accurate. Based upon the estimated costs for the <br /> project 3 sites (47, 51, 52, 53) were removed from the project to reduce the overall cost. These sites are <br /> included on the attached spreadsheet for reference purposes. WSB would complete the wok indicated <br /> on the attached spreadsheet with the caveats listed above for an amount not to exceed $86,661. <br /> WSB will also prepare and submit the require documentation for the shovel ready certification through <br /> the Department of Employment and Economic Development's certification program. The fee for each of <br /> the parcels that are placed in the program would be $3,500 which would include the certification fee of <br /> $3,250 per site. The above estimated fee includes the certification of 6 sites and would be adjusted <br /> accordingly should the city decide to increase or decrease the number of sites certified. The has <br /> indicated that Connexus Energy will be assisting with the cost of the certification which has also been <br /> identified for the projected costs. Should that number change the total cost of the project would be <br /> adjusted accordingly. <br /> Minneapolis■St. Cloud <br /> Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.