Laserfiche WebLink
II. Facility Assessment <br /> i <br /> a - <br /> Figure B.5.5: Hole in floor is covered with sheet metal Figure B.5.8: Office space is insufficient for staff needs <br /> Figure B.5.6: Areas of missingVCT floor finish Figure B.5.9: Staff lockers are not handicap accessible <br /> - Y <br /> j <br /> T _1 <br /> Figure B.5.7: VCT floor finish shows extensive wear Figure 8.5.10: Supply and waste pipes at lavatory are not insulated <br /> 11.13 1 Ramsey Public Works Study B K V <br /> DRAFT GROUP <br />