|
V. Facility Comparisons
<br /> Public Works•Space Comparison
<br /> r
<br /> Red Wing 720,845
<br /> ,513 41,19 8.D3 57,310
<br /> Willmar .680 15.95 16.96 68,600
<br /> Northfield ,581 8.61 10.82 52,400
<br /> Golden Valley 10.55 1.68 54,400
<br /> Farmington 22.167 14.94 6.76 44,970
<br /> Crystal 22,588 S.88 5.30 63,000 Built In 2015,$12.8M
<br /> Elk River 23,447 43 82 17.47 83,244 Fleet 44,144 sf,Mechanics 13,300 sf,Shops 18,400 sf,Office 7,400 e!
<br /> Prior lake 24,408 1933, 11.40 48,453
<br /> Chanhassen 24,432 22.88 7.52 85,250
<br /> White Bear Lake 24,555 8.66 4.23 55,259
<br /> Austin 24,763 10.84 14.04 68,960
<br /> Savage 28,639 16.45 14.51 66,600 29,000 sf addition in 2012
<br /> Andover 31,709 34.83 14.99 111,679 Size reflects 2015 needs assessment,current size is 68,680 sf
<br /> Cottage Grove 35,339 37.48 11.27 63,922
<br /> ,Shakopee 39,167 29.32 12.52 69,000
<br /> Average 25,256 21.32 10.50 66,203
<br /> Ramsey{Ealsting) 24,935 29.79 7.74 32,000
<br /> (Proposed GSF) 11.59 66,245
<br /> General Notes:
<br /> 1. Facility size does not include area for granular storage buildings.
<br /> END OF SECTION
<br /> V.2 I Ramsey Public Works Study-Comm. No. 1937.02 B K V
<br /> DRAFT GROUP
<br />
|