Laserfiche WebLink
V. Facility Comparisons <br /> Public Works•Space Comparison <br /> r <br /> Red Wing 720,845 <br /> ,513 41,19 8.D3 57,310 <br /> Willmar .680 15.95 16.96 68,600 <br /> Northfield ,581 8.61 10.82 52,400 <br /> Golden Valley 10.55 1.68 54,400 <br /> Farmington 22.167 14.94 6.76 44,970 <br /> Crystal 22,588 S.88 5.30 63,000 Built In 2015,$12.8M <br /> Elk River 23,447 43 82 17.47 83,244 Fleet 44,144 sf,Mechanics 13,300 sf,Shops 18,400 sf,Office 7,400 e! <br /> Prior lake 24,408 1933, 11.40 48,453 <br /> Chanhassen 24,432 22.88 7.52 85,250 <br /> White Bear Lake 24,555 8.66 4.23 55,259 <br /> Austin 24,763 10.84 14.04 68,960 <br /> Savage 28,639 16.45 14.51 66,600 29,000 sf addition in 2012 <br /> Andover 31,709 34.83 14.99 111,679 Size reflects 2015 needs assessment,current size is 68,680 sf <br /> Cottage Grove 35,339 37.48 11.27 63,922 <br /> ,Shakopee 39,167 29.32 12.52 69,000 <br /> Average 25,256 21.32 10.50 66,203 <br /> Ramsey{Ealsting) 24,935 29.79 7.74 32,000 <br /> (Proposed GSF) 11.59 66,245 <br /> General Notes: <br /> 1. Facility size does not include area for granular storage buildings. <br /> END OF SECTION <br /> V.2 I Ramsey Public Works Study-Comm. No. 1937.02 B K V <br /> DRAFT GROUP <br />