My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 08/17/2016
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2016
>
Agenda - Parks and Recreation Commission - 08/17/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:50:22 PM
Creation date
8/30/2016 12:20:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
08/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program 2016 thru 2020 <br /> City of Ramsey, Minnesota <br /> Project# 04-WTR-018 <br /> Project Name Watermain Looping: (Ramsey Blvd to Traprock St.) <br /> Type Improvement Department Water Utility <br /> Useful Life 60 Years Contact Unassigned <br /> Category Water Utility Improvement Priority 2-New Addition(High) <br /> Status Active <br /> Description Total Project Cost: $185,000 <br /> This project includes the extension of a 12"watermain from Ramsey Blvd to Traprock Street with the extension of Riverdale Drive along the <br /> south side of Highway 10. <br /> Watermain Extension(04-WTR-018) $ 185,000 <br /> Stormwater(16-STM-003) $ 103,050 <br /> Street Improvement(12-STR-007) $ 965,230 <br /> *Street Lighting(16-STLT-001) $ 275,000(related project not included in costs) <br /> Total Project Cost $ 1,253,280(not including street lights) <br /> Justification <br /> Development south of Highway 10 is anticipated as a result of The COR,including through the Mississippi West County Park. The project will <br /> provide dependable water pressure and supply to this developing area. <br /> The city was awarded a MNDOT cooperative agreement funds grant to extend Riverdale Drive from Traprock Street to Ramsey Blvd in <br /> 2016/2017.Installation of water with street construction will eliminate the need to dig up the street in the future. <br /> Expenditures 2016 2017 2018 2019 2020 Total <br /> Improvements Other than 185,000 185,000 <br /> Building Cost <br /> Total 185,000 185,000 <br /> Funding Sources 2016 2017 2018 2019 2020 Total <br /> Water Utility Fund 185,000 185,000 <br /> Total 185,000 185,000 <br /> 144 <br />
The URL can be used to link to this page
Your browser does not support the video tag.