My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 08/17/2016
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2016
>
Agenda - Parks and Recreation Commission - 08/17/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:50:22 PM
Creation date
8/30/2016 12:20:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
08/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name Department Project# Priority Project Cost <br /> Replace Engr Car#407 With Chevy Impala Eqpt Replacement PW-407 3 28,000 <br /> Replace 2002 3/4 Ton Truck 4x4: Unit#637 Eqpt Replacement PW-637 3 45,000 <br /> Replace Sidewalk Machine: Unit#655 Eqpt Replacement PW-655 3 99,000 <br /> Replace 2006 Tandem Axle Plow Truck Unit#668 Eqpt Replacement PW-668 3 225,000 <br /> Replace 2013 Toro Wide Area Mower: Unit#679 Eqpt Replacement PW-697 3 95,000 <br /> Reconstruct Riverdale Drive to Tungston Street Street Improvements 12-STR-008 3 1,350,000 <br /> Total for:Priority 3 1,916,000 <br /> Priority 4-New Addition(Med) <br /> New 1-Ton Pickup With Box&Plow Equipment Eqpt Replacement PW-703 4 50,000 <br /> Watennain Sunfish Lk Blvd Water Utility 12-WTR-001 4 450,000 <br /> Total for:Priority 4 500,000 <br /> Priority 5-Opportunity,Unfunded/Placeholder <br /> Community Center Construction Municipal Buildings 04-BLDG-002 5 20,000,000 <br /> Old Town Hall Restoration Municipal Buildings 08-BLDG-005 5 221,300 <br /> Observation deck on the Mississippi E of Dolomite Park Improvements 06-PARK-015 5 85,000 <br /> Trail Connections Park Improvements 06-PARK-019 5 200,000 <br /> McKinley Trail Connection to Anoka Park Improvements 12-PARK-008 5 50,000 <br /> Abandon Liftstation Wildlife Sanctuary Sewer Utility 04-SEW-001 5 352,000 <br /> Abandon Lift Station River Pines Sewer Utility 08-SEW-004 5 45,000 <br /> Fire Station 1 Sanitary Sewer Service Sewer Utility 12-SEW-002 5 60,000 <br /> Acquire outlots"A"in Rivers Bluff and Reilly Est Site Acquisitions 06-ACQ-002 5 20,000 <br /> Alpaca Estates Outlot Site Acquisitions 08-ACQ-002 5 35,000 <br /> Whispering Pines Estates Plat 2 Storm Sewer Stormwater Utility 11-STM-003 5 330,000 <br /> River Pines Lift Station Street Connection Street Improvements 08-STR-005 5 55,000 <br /> North Hwy 10 Frontage Road-Ramsey to SLB Street Improvements 16-STR-003 5 5,900,000 <br /> South Hwy 10 Frontage Rd-SLB to Anoka Street Improvements 16-STR-004 5 2,000,000 <br /> River Pines Lift Station Water Connection Water Utility 08-WTR-003 5 20,000 <br /> Fire Station#1 Extension of Water Water Utility 11-WTR-003 5 55,000 <br /> Construct Well and Pumphouse#9 Water Utility 16-WTR-002 5 1,500,000 <br /> Total for:Priority 5 30,928,300 <br /> Total for 2020 33,344,300 <br /> GRAND TOTAL 98,960,542 <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.