Laserfiche WebLink
PRELIMINARY COST ESTIMATE <br />Ramsey Parks Commission <br /> <br />HOCKEY RINK <br /> <br />Summary Cost - 85x200~ permanent rink <br /> 2" board material, lighted <br /> without labor $9,000-$10,000 <br /> with labor $18,000-$20,000 <br /> <br />(Lighting varies min. $700/ea. - $1,000/ea. pole) <br /> <br />Cost.Comparison <br /> <br />City of Ramse¥ - Elementary School - 6 years ago <br /> Permanent 85x200, lighted <br /> without labor <br /> <br />$9,000 <br /> <br />City of Champlin <br /> Permanent 48" boards <br /> 2" treated material <br /> without labor <br /> Temporary 30" boards <br /> without labor <br /> <br />$4,000-$5,000 <br /> <br /> $3,000 <br /> <br />Means/Lawcon Estimate <br /> <br />85x200 permanent, lighted <br /> $9,000-$13,400 <br /> <br />WARMING HOUSE <br /> <br />New Site <br /> <br />20x30 masonry construction on 4" slab <br />no toilets, includes minor site <br />preparation, electrical and heating <br />at $25.00-$30.00/SF <br /> $15,000-$18,000 <br /> <br />~dd on.to Existing Warming House at Elementary School <br /> <br />20x30 concrete block, <br />roof tie in @ $27.00/SF <br /> <br />$16,200 <br /> <br />Additional Cost Considerations <br /> <br />· Satellite toilets @ $800.O0/ea. or lease <br />· For new site, distance to electrical tie-in <br /> <br /> <br />