Laserfiche WebLink
,)ack Ippel <br /> <br />-2- <br /> <br />PHASE ! a <br /> <br />1. Agency/Project Coordination <br /> <br />1 <br />[ <br /> <br />2. ,,Inventor~ <br /> <br />A. History of Airport <br />B. Role in Metro Area <br />C. Description of Facilities <br /> 1) Review of Existing Conditions <br /> 2) Users View of Facilities <br /> O. Historical Activity <br /> 1) Based Aircraft <br /> 2) Operations <br /> E. Deficiencies/Limitations of Facilities & Site <br /> F. Aircraft Usage Survey <br /> <br />3. Activities Forecasts (1983-2003) <br /> <br /> A. Relationship to MAC System & Metro Region <br /> B. Develop Activities Forecasts <br /> 1) Based Aircraft <br /> 2) Operations <br /> 3) Aircraft Mix <br /> <br />Facility Requirements <br /> <br /> e <br /> Determine Facilities from Forecast & Role for: <br /> A. Atrstde <br /> 1) Runway <br /> 2) Taxtway <br /> 3) Operation Limitations <br /> 4) Approach Aids <br />F 5) Lighting <br /> B. Landside <br /> 1) Terminal Area <br />F 2) Airport Access Plan <br /> 3) Aviation Related Business Area <br /> <br />L~ <br /> <br />m~L <br /> <br />Field Data Collection <br /> <br /> $800.00 <br />$1,750.00 <br /> <br />December 13, 19h3 <br /> <br />$1,500.00 <br /> <br />$3,250.00 <br /> <br />$6,600.00* <br /> <br />A. Aerial Topography & Site Control <br /> (We have the option of a new tolmo to be flown in the spring <br /> of 1984 at $4,050.00 or to update the existing topo at $3,000.~0.) <br />B. Obstruction Survey <br />C. Sells Report <br />D. Document Utilities <br />E. Prepare Property Map (one sheet) <br /> <br />Based oA Opdating existing topo. <br /> <br /> <br />