My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/10/1984
Ramsey
>
Public
>
Agendas
>
Council
>
1984
>
Agenda - Council - 09/10/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 11:18:41 AM
Creation date
7/6/2004 12:30:02 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/10/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I I0. <br /> <br />I 12. The method providlr~ m,~rm%-e ~ot ~pectfkd plan. <br /> f~ancial <br /> <br />I 13. The net worth test Jsnot · satisfactory method of providin8 postciosure <br /> financial ~ssurancesince the availability of the necesMry assets Is <br /> <br />I <br />I <br />I <br />I <br /> <br />~s~ertain. <br /> <br />Clarification ~nd/or correction of the table included with the transmittal <br />iette~ is needed. <br /> <br />Closure cost should be based on the ~ssumption that the site will be closed <br /> the current license year. <br /> <br />16, <br /> <br />The urdt cost for application o~ fina~ cover and topsoU are low and should <br />be increased to at leut $3 per cubic yard. <br /> <br />17. TopsoU cost estimates should be based on an avera&e thickness of 8 inche~ <br /> <br />i 18. Access to on-site cover materials should be guarenteed or the cost o! <br /> purchasir~ said materiads- included in the cost ansiysis and financla~ <br /> <br />I 19. <br /> <br />ProvMe for the cost of constructin8 and operatin8 ~uture leachate oontrol <br /> <br />20. A topographic map (2 foot co~t~) o~ the closed iandfiU, prepared from <br /> ~n aerial survey, should be provided at closure. <br /> <br />21. <br /> <br />The u~it oost for dos~e surveyin8 and cer~ication are low and sJx)uld be <br />increased. <br /> <br />I 22. The contingency and administration ~tlowanoe for site terndnation and the <br /> clos~e and post closure periods are iow ~nd should be increased to at least <br /> <br />I 23. A mrface water conveyance system, other than grass swales and slopes, <br /> should be provided. <br /> <br />The estimated volume of annual erosion is low and should be increased to <br />mt least ~!0,000 per year for the first five years and at least $3,000 per <br />year for the next five years. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.