My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/10/1984
Ramsey
>
Public
>
Agendas
>
Council
>
1984
>
Agenda - Council - 09/10/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 11:18:41 AM
Creation date
7/6/2004 12:30:02 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/10/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I (~une 25, 1084 TestlBony of Benry Cook; Plans, Section <br /> ~ondit~onal ~se <br />J Fire Control. The ~ssibility o~ fire st the llndfill <br /> <br />I is reduced by daily cover and the use of earth Baterials, In the <br /> unlikely event of fire, earth ~aterials are stockpiled in active <br />I areas in the event of its need for extinguishin9 fires and a site <br /> <br />I water tank, bulldozer and scraper are available for im~ediate <br /> response. Each piece of equipMnt, as well as buildings on the <br />I site, will have fire control equipment and site personnel are <br /> <br />i routinely provided instruction in firefighting procedures. <br /> (June 25, 1984 Testimony of Renry Koch; Plans, Sections III.B and <br /> <br />I <br />I <br /> <br />Closure and Post-Closure Care. <br /> <br />At such time as the <br /> <br />landfill is closed, Waste ~anage~ent will continue an active <br /> <br />I closure and post-closure program which includes routine inspec- <br /> tions, maintenance, revegetation, if necessary, erosion control, <br />I removal of leachate, and continued ~onitorinq to assure that the <br /> <br />I facility is performing as it should. (June 25, 1984 Testimony of <br /> Henry Koch; Plans, Sections IX, II and III. County o_[f Anoka <br /> <br />I ~oli~ W~st? Ordi____~nan__c£ 73-1, 82-1, 83-2 and 83-3, Section V, <br /> _ <br /> subsections 5 and 6 provide comprehensive requirements for a 5 <br />I year closure and a 20 year post-closure period.) <br /> <br />I 17. The North 80. Except as discussed below, the sa~e <br /> construction and operating criteria set forth with respect to <br />I South 70 apply to the ~orth 80 and the Coanission draws the sa~e <br /> <br />conclusions with respect to said items. <br /> <br />11 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.