Laserfiche WebLink
I <br />I <br /> <br /> 7 <br /> <br /> whom a contract is awarded fails to enter promptly into a <br />I written contact and to furnish the required bond, the defaulting <br /> bidder shall forfeit to the City the amount of his cash deposit, <br /> cashier's check, bid bond or certified check, ~nd the Council <br />I may thereupon award the contract to the next lowest responsible <br /> bidder. ~hen it appears to the Council that the cost of the <br /> entire work projected will be less than $5,000.00, or ~enever <br />i no bid is submitted after proper advertisement or the only bids <br /> submitted are higher than the engineer's estimate, the Council <br /> may advertise for new bids or, without advertising for bids, <br /> directly purchase the materials for the work and do it by the <br />I of labor in other the Council <br /> employment <br /> day <br /> or <br /> any <br /> manner <br /> considers proper. The Council may have the work supervised by <br /> the City Engineer, or other qualified person but shall have the <br />I work supervised by a registered engineer if done by day labor <br /> and it appears to the Council that the entire cost of all work <br /> and materials for the improvement will be more than $2,000.00. <br />I In case of improper construction or unreasonable delay in the <br /> prosecution of the work by the contractor, the Council may order <br /> and cause the suspension of the work at any time and relet the <br /> · contract, or order reconstruction of any portion of the work <br /> improperly done, and where the cost of completeton or <br /> reconstruction necessary will be less than $10,000.00, the <br /> Council may do it by the employment of day labor. <br /> <br /> Subdivision 3. Day Labor; Detailed Report. When the <br />Council has performed construction work by day labor, it shall <br /> <br />I cause a detailed report to be filed with the Clerk and certified <br /> by the registered engineer or other person in charge, if there <br /> is no registered engineer. The report shall show: <br /> <br />I <br />I <br /> <br />(a) The complete cost of the construction; <br />(b) Final quantities of the various units of work done; <br />(c) Materials furnished for the project and the cost of <br /> each item thereof; <br />(d) Cost of labor, cost of equipment hired, and supervisory <br /> <br /> costs. <br />I The report shall have attached a certificate by the registered <br /> engineer or other person in charge that the work was done <br />I according to the plans and specifications, or, if there were any <br /> deviations from them, an itemized statement of these deviations. <br /> <br />i Subdivision 4. Alternate Procedure On Street Improvements. <br /> As to any improvement or improvements consisting of grading, <br /> graveling, or bituminous surfacing of streets and alleys, the <br />i Council may proceed in the manner provided in this Code, except <br /> that it may <br /> <br />(1) <br /> <br />order the work done by day labor, regardless of the <br />estimated cost of such improvement or improvements, and <br /> <br /> <br />