Laserfiche WebLink
19 <br /> <br />2O <br /> <br />rJe~crlbe m~y physical alteration (e.g. dikes, e~cevatlon, fill, stre~ dlve~slon) <br />of ~1 ~atn~ systm, I~e, ~em, e~/~ ~tla~. Estimate q~ntr~ of <br /> <br />Construct road through and fill 3/4 acre wetland area. 4000 c.y. mate~al to be <br />dredged and material used for topsoil. <br /> <br /> the project Fequl~e an appropriation of grc~ncl or su~f~ce wat~-? <br />Explain (Indicate quantity end sou~oe): <br /> <br />1 *'11I ttm proJec~ affect: <br /> aa surface ~ater quality (o~ c~ off t~ sl~)7 <br /> b. ~nd~at~ q~ll~ (~ ~ off t~ site)? <br /> <br /> c. ~ndwat~ I~els In any ~lls (~ ~ off t~ site}2 <br /> Explain ~h d~l~ e~ aft~ ~s~lon I~t~l~ any dish.gas <br /> <br />22 <br /> <br />~hat type of ~st~ ~ater treatn~e~t .,111 be used7 <br /> X municipal In,dlvldual (on-site) other <br />De~cclbe fTpe of treatment system and ~o~.~t ~reate<l In gal Ions/day. Sr~e Ioc_a- <br />tlo~ of ma~-munl¢lpal ~fs'~e~s on a $1t~ rasp end l~e results of percolation test <br />If w~rrant~ed. Indicate If pre-treatment ~ees~-es ~111 be used. <br /> <br />23 <br /> <br />De~crlbe and Indicate o~ a slte ~ap the prc~lslons to control erosion end st~n,- <br />~al~ run--off, IncluOe size and tocetlon of any ret~tlo~ basins° end discharge <br />point(s). <br /> <br />24 <br /> <br />VIII the project <br />a. afc pollution? <br />b. dust? <br />c. nol <br /> <br />d. <br /> <br />Explain ~h d~l~ <br /> <br />25 <br /> <br />O, esc~lb, e the type m~d ~ount of sol Id vesta end/or hazardous .ast~ that ~111 be <br /> <br />gonocet~d end ~ ~t~d e~ I~fl~ of dlsCs~l: <br /> <br /> no hazardous waste. <br /> Solid waste. Amount generated by residential homes nnd disposed of in City of <br /> Anoka hmdfill located 2 miles West of project. <br /> <br />3 <br /> <br /> <br />