My WebLink
|
Help
|
About
|
Sign Out
Home
Ordinance - #83-01 - Index for Changes - 01/11/1983
Ramsey
>
Public
>
Ordinances
>
1983
>
Ordinance - #83-01 - Index for Changes - 01/11/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:43:45 PM
Creation date
7/9/2004 7:47:58 AM
Metadata
Fields
Template:
Resolutions & Ordinances
Resolutions or Ordinances
Ordinances
Resolution or Ordinance Number
#83-01 - Index for Changes
Document Date
01/11/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[ <br />[ <br />[ <br />[ <br />[ <br />[ <br /> <br />[ <br />[ <br />[ <br />[ <br />[ <br />[ <br />[ <br /> <br />[ <br /> <br />Ce <br /> <br /> unreasonably interfering with other electrical or electronic <br /> systems or the reception of other television or radio <br /> receivers. <br /> <br />Grantee shall construct and maintain a System that at least <br />meets minimum technical standards now or hereafter promul- <br />gated by the FCC relating to cable communication systems; <br />provided, however, that in no event shall the technical <br />standards required to be met by Grantee be less stringent <br />than the FCC standards in effect at the time of the adoption <br />of the Ordinance, nor shall Grantee be required to meet min- <br />imum FCC technical standards which apply solely to cable <br />communications systems for which franchises are granted sub- <br />sequent to the acceptance of this Franchise. The FCC tech- <br />nical standards relating to cable communications systems <br />contained in subpart K of part 76 of the FCC rules are <br />hereby incorporated by reference and made a part hereof. <br /> <br />The System shall be designed for and operated on a 24 hours <br />a day continuous operation basis. <br />Grantee shall initially and subsequently test the technical <br />capacity of the System according to the procedures delineat- <br />ed in the Offering. Additionally, Grantee agrees to allow <br />City to select a consultant if City deems it is necessary to <br />review and perform such testing procedure. The results of <br />any tests required by the FCC shall be filed within ten days <br />of the conduct of such tests with the City and the Board. <br />Other representatives of City may be present during testing. <br />Tests may be done annually at such times as is determined by <br /> <br />14 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.