My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/24/1984
Ramsey
>
Public
>
Agendas
>
Council
>
1984
>
Agenda - Council - 05/24/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 11:16:41 AM
Creation date
7/9/2004 10:31:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/24/1984
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.I <br /> I <br /> I <br />I <br />I <br />! <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />i <br />I <br /> <br /> be sampled are 10 if the Miller residence <br /> well and Well No. 4 are bot~included. <br /> <br /> $5,000/sampling period x 4 periods/year <br /> <br />8. Operation and Maintenance of Methane <br /> Collection System. <br /> <br /> This amount is based on the operating <br /> costs for the latest period during which <br /> the system has been operated. <br /> <br /> $3OO/month electrical x ]2 months <br /> +$5,000/year maintenance <br /> +$]O,O00/year inspection/labor <br /> <br />9. Gas Monitoring Program <br /> <br /> Monthly monitoring program of measurements <br /> at the various probe sites. <br /> <br /> 4 man hours x $20/man hour x ]2 months <br /> <br />20,000 <br /> <br />18,600 <br /> <br />1,000 <br /> <br /> SUBTOTAL, ANNUAL POST CLOSURE COSTS <br /> ADMINISTRATION AND CONTINGENCIES AT 5% <br /> TOTAL ANNUAL POST CLOSURE COSTS <br /> <br />CONCLUSION <br /> This is a summary of all procedures <br /> <br />$ 57,900 <br />$ 2,900 <br />$ 60,8o0 <br /> <br />and requirements for the <br /> <br />closure and post-closure long term operations of the Anoka Sanitary <br />Landfill. The procedures and requirements conform to the regulations <br />of Anoka County and the MPCA. Review of these plans will be made <br />annually until the end of the post-closure period. The plans will be <br />revised and amended as necessary as costs and standards set by <br />governmental agencies are altered. Any revisions to the plans will be <br />subject to the approval of the County Board. <br /> <br />10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.