Laserfiche WebLink
Parcel Description Area Allocation % Assessment Amount <br />Lot 1, Block 1 86.436 acres 60% $1,014,006.34 <br />Outlot B 45.196 acres 33% $563,751.00 <br />Outlot D 9.621 acres 7% $123,320.00 <br />Total $1,701,077.34 <br />The composition of the maximum amount of Project Costs is set forth as listed below: <br />Estimated Improvement Costs <br />Street and Trail Improvement - Bunker Lake Extension <br />Drainage Improvements - Bunker Lake <br />Sanitary Sewer - Bunker Lake <br />Watermain Extension - Bunker Lake Blvd. <br />Puma Street Surfacing & Trail <br />5% Contingency <br />Engineerins Costs <br />Developer Construction Engineering Fee <br />Design Engineering Fee <br />3% for City Construction Administration <br />Allocation of Development Fees <br />Sanitary Sewer Trunk Fee <br />Stormwater Trunk Fee <br />Water Trunk Fee <br />Trail Development Fee <br />Dirt Road Elimination Program <br />Sub -total <br />Sub -total <br />Sub -total <br />Sub -total <br />Grand Total <br />$429,133.32 <br />$113,176.31 <br />$13 5,096.73 <br />$246,717.05 <br />$247,3 51.74 <br />$1,171,475.15 <br />$58,573.76 <br />$1,230,048.91 <br />$64,363.59 <br />$85,000.00 <br />$35,144.25 <br />$184,507.84 <br />$70,374.44 <br />$103,137.15 <br />$215,497.27 <br />$58.043.00 <br />$447,051.86 <br />($160,531.28) <br />$1,701,077.34 <br />4. Waiver by Owner. The Assessments levied under Section 3 above shall be <br />deemed adopted on the date this Agreement is signed by the City. Owner, by signing this <br />Agreement, acknowledges that the Property is benefited by the Stage I City Improvements in an <br />amount at least equal to the amount of the Project Costs, and hereby unconditionally waives all <br />procedural and substantive objections to the Assessment, including without limitation any right <br />to a hearing and any right to appeal the levying of the Assessment. <br />