Laserfiche WebLink
F. No Claim for an adjustment in Contract Price <br />or Contract Times will be valid if not <br />submitted in accordance with this Paragraph <br />10.05. <br />ARTICLE 11— COST OF THE WORK; <br />ALLOWANCES; UNIT PRICE WORK <br />11.01 Cost of the Work <br />A. Costs Included: The term Cost of the Work <br />means the sum of all costs, except those <br />excluded in Paragraph 11.01.B, necessarily <br />incurred and paid by Contractor in the proper <br />performance of the Work. When the value of <br />any Work covered by a Change Order or <br />when a Claim for an adjustment in Contract <br />Price is determined on the basis of Cost of the <br />Work, the costs to be reimbursed to <br />Contractor will be only those additional or <br />incremental costs required because of the <br />change in the Work or because of the event <br />giving rise to the Claim. Except as otherwise <br />may be agreed to in writing by Owner, such <br />costs shall be in amounts no higher than those <br />prevailing in the locality of the Project, shall <br />include only the following items, and shall not <br />include any of the costs itemized in Paragraph <br />11.01.B. <br />1. Payroll costs for employees in the direct <br />employ of Contractor in the performance <br />of the Work under schedules of job <br />classifications agreed upon by Owner and <br />Contractor. Such employees shall <br />include, without limitation, <br />superintendents, foremen, and other <br />personnel employed full time at the Site. <br />Payroll costs for employees not <br />employed full time on the Work shall be <br />apportioned on the basis of their time <br />spent on the Work. Payroll costs shall <br />include, but not be limited to, salaries and <br />wages plus the cost of fringe benefits, <br />which shall include social security <br />contributions, unemployment, excise, and <br />payroll taxes, workers' compensation, <br />health and retirement benefits, bonuses, <br />sick leave, vacation and holiday pay <br />applicable thereto. The expenses of <br />performing Work outside of regular <br />working hours, on Saturday, Sunday, or <br />legal holidays, shall be included in the <br />above to the extent authorized by Owner. <br />2. Cost of all materials and equipment <br />furnished and incorporated in the Work, <br />including costs of transportation and <br />storage thereof, and Suppliers' field <br />services required in connection therewith. <br />All cash discounts shall accrue to <br />Contractor unless Owner deposits funds <br />with Contractor with which to make <br />payments, in which case the cash <br />discounts shall accrue to Owner. All <br />trade discounts, rebates and refunds and <br />returns from sale of surplus materials and <br />equipment shall accrue to Owner, and <br />Contractor shall make provisions so that <br />they may be obtained. <br />3. Payments made by Contractor to <br />Subcontractors for Work performed by <br />Subcontractors. If required by Owner, <br />Contractor shall obtain competitive bids <br />from subcontractors acceptable to Owner <br />and Contractor and shall deliver such <br />bids to Owner, who will then determine, <br />with the advice of Engineer, which bids, <br />if any, will be acceptable. If any <br />subcontract provides that the <br />Subcontractor is to be paid on the basis <br />of Cost of the Work plus a fee, the <br />Subcontractor's Cost of the Work and fee <br />shall be determined in the same manner <br />as Contractor's Cost of the Work and fee <br />as provided in this Paragraph 11.01. <br />4. Costs of special consultants (including <br />but not limited to Engineers, architects, <br />testing laboratories, surveyors, attorneys, <br />and accountants) employed for services <br />specifically related to the Work. <br />5. Supplemental costs including the <br />following: <br />a. The proportion of necessary <br />transportation, travel, and <br />subsistence expenses of Contractor's <br />employees incurred in discharge of <br />duties connected with the Work. <br />b. Cost, including transportation and <br />maintenance, of all materials, <br />supplies, equipment, machinery, <br />appliances, office, and temporary <br />facilities at the Site, and hand tools <br />not owned by the workers, which are <br />consumed in the performance of the <br />Standard General Conditions <br />00 72 00-33 <br />