Laserfiche WebLink
13.03 Tests and Inspections <br />A. Contractor shall give Engineer timely notice <br />of readiness of the Work for all required <br />inspections, tests, or approvals and shall <br />cooperate with inspection and testing <br />personnel to facilitate required inspections or <br />tests. <br />B. Owner shall employ and pay for the services <br />of an independent testing laboratory to <br />perform all inspections, tests, or approvals <br />required by the Contract Documents except: <br />1. for inspections, tests, or approvals <br />covered by Paragraphs 13.03.0 and <br />13.03.D below; <br />2. that costs incurred in connection with <br />tests or inspections conducted pursuant to <br />Paragraph 13.04.B shall be paid as <br />provided in said Paragraph 13.04.C; and <br />3. as otherwise specifically provided in the <br />Contract Documents. <br />C. If Laws or Regulations of any public body <br />having jurisdiction require any Work (or part <br />thereof) specifically to be inspected, tested, or <br />approved by an employee or other <br />representative of such public body, Contractor <br />shall assume full responsibility for arranging <br />and obtaining such inspections, tests, or <br />approvals, pay all costs in connection <br />therewith, and furnish Engineer the required <br />certificates of inspection or approval. <br />D. Contractor shall be responsible for arranging <br />and obtaining and shall pay all costs in <br />connection with any inspections, tests, or <br />approvals required for Owner's and <br />Engineer's acceptance of materials or <br />equipment to be incorporated in the Work; or <br />acceptance of materials, mix designs, or <br />equipment submitted for approval prior to <br />Contractor's purchase thereof for <br />incorporation in the Work. Such inspections, <br />tests, or approvals shall be performed by <br />organizations acceptable to Owner and <br />Engineer. <br />E. If any Work (or the work of others) that is to <br />be inspected, tested, or approved is covered <br />by Contractor without written concurrence of <br />Engineer, it must, if requested by Engineer, be <br />uncovered for observation. <br />F. Uncovering Work as provided in Paragraph <br />13.03.E shall be at Contractor's expense <br />unless Contractor has given Engineer timely <br />notice of Contractor's intention to cover the <br />same and Engineer has not acted with <br />reasonable promptness in response to such <br />notice. <br />13.04 Uncovering Work <br />A. If any Work is covered contrary to the written <br />request of Engineer, it must, if requested by <br />Engineer, be uncovered for Engineer's <br />observation and replaced at Contractor's <br />expense. <br />B. If Engineer considers it necessary or advisable <br />that covered Work be observed by Engineer <br />or inspected or tested by others, Contractor, at <br />Engineer's request, shall uncover, expose, or <br />otherwise make available for observation, <br />inspection, or testing as Engineer may require, <br />that portion of the Work in question, <br />furnishing all necessary labor, material, and <br />equipment. <br />C. If it is found that the uncovered Work is <br />defective, Contractor shall pay all claims, <br />costs, losses, and damages (including but not <br />limited to all fees and charges of engineers, <br />architects, attorneys, and other professionals <br />and all court or arbitration or other dispute <br />resolution costs) arising out of or relating to <br />such uncovering, exposure, observation, <br />inspection, and testing, and of satisfactory <br />replacement or reconstruction (including but <br />not limited to all costs of repair or <br />replacement of work of others); and Owner <br />shall be entitled to an appropriate decrease in <br />the Contract Price. If the parties are unable to <br />agree as to the amount thereof, Owner may <br />make a Claim therefor as provided in <br />Paragraph 10.05. <br />D. If, the uncovered Work is not found to be <br />defective, Contractor shall be allowed an <br />increase in the Contract Price or an extension <br />of the Contract Times, or both, directly <br />attributable to such uncovering, exposure, <br />observation, inspection, testing, replacement, <br />and reconstruction. If the parties are unable to <br />agree as to the amount or extent thereof, <br />Standard General Conditions <br />00 72 00-38 <br />