My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/11/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 10/11/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:53:36 PM
Creation date
10/26/2016 9:25:48 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/11/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
510
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/15/2016: J&J Contracting completes phase 1 of demolition process. <br />08/23/2016: Council adopt plans & specifications and authorizes advertisement for bids for phase 2 of the <br />demolition project. <br />10/11/2016:**(this case) Council was to consider approving contract for demolition. <br />11/30/2016: Phase 2 demolition SUBSTANTIAL completion. <br />06/30/2017: Phase 2 demolition FINAL completion. <br />07/30/2017: Developer with purchase agreement on the remaining portion of the former municipal center <br />site must close. <br />Observations/Alternatives: <br />UPDATE <br />Per the original project schedule, bids were opened on 09/21/2016. Eleven companies bid. Bids ranged from <br />$92,900 to $391,263--with a cluster of bids ranging from $150K-$220K. The Engineer's estimate for this project <br />was $175,000. DRC had the low bid of $92,900. The Project Manager (Hakanson Anderson) followed up with <br />DRC, and confirmed they understood the scope of work for this project, and completed a reference check. In <br />summary, Hakanson Anderson believes DRC has a good bid, and believes they are a qualified bidder in regard to <br />performance. <br />During the bidding process an issue occurred. Four of the eleven bidders were provided information by City satff <br />related to "crushing" construction debris. The information received by said four bidders was not shared with all <br />bidders. As a result, some bidders were bidding on different information. In summary, the information provided <br />regarding "crushing" by the City can have an effect on project costs --thus effecting bid results. With this in mind, <br />staff believes it would be reasonable to consider re -bidding this project for the sake of transparency, equity, and <br />future credibility in regard to the City's bid process. Below are details. <br />Crushing (what is it?): crushing is a technique used by contractors during construction/ demolition projects <br />to reclaim/ reuse construction materials. Typically, items like bricks, concrete, and asphalt can be crushed <br />and reused as an ingredient for a new product. A good example is Commercial Asphalt in Ramsey --they use <br />recycled materials from construction sites to create various products that go into road materials. <br />Crushing (why does it matter?): crushing allows a demolition contractor to reduce their project costs by <br />increasing revenues they can pull from a particular project (by reselling the materials they demo and crush). <br />One important component of crushing is whether it is done ON -site or OFF -site of a particular demolition <br />project. Crushing ON -site further reduces costs for a demolition contractor --as they can eliminate <br />transporting materials one more time (i.e. they don't need to transport materials to another site for <br />crushing --they can transport directly to the end -user). <br />Crushing (what the issue with this project?): the City's bid documents never explicitly indicated whether <br />crushing is allowed, or not allowed, ON -site. Without a specific prohibition in the bid document, crushing <br />was allowed ON -site per the bid documents --technically speaking. However, during the bid process, City <br />staff verbally communicated to only four of the eleven bidders that crushing was not allowed ON -site. As a <br />result, a conflict within the information provided to bidders exists. <br />Crushing (important notes): (1) the lowest bidder DRC did include crushing ON -site. (2) staff can support <br />crushing materials ON -site. The original staff concern regarding crushing was noise. After some research, it <br />has been found crushing (with proper equipment) can be quieter than most other activities that will occur on <br />site during the demolition process. As a result, crushing is no longer seen as a concern by staff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.