My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/23/1984
Ramsey
>
Public
>
Agendas
>
Council
>
1984
>
Agenda - Council - 10/23/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 11:19:09 AM
Creation date
7/9/2004 1:51:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/23/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> I <br />:1 <br />I <br /> I <br /> I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />'.1 <br /> I <br /> I <br /> I <br /> I <br /> <br />CHANGE ORDER NO. 1 (Continued) <br /> <br />October 18, 1984 Hakanson Anderson Associates, Inc. <br /> <br />~hanges <br /> <br /> Decrease Increase <br />in Contract Price in Contract Price <br /> <br />7. Add 115' of 15" RCP Class III <br /> storm sewer and a 15" flared end <br /> with a grate between Lots 13 & 14, <br /> Block 5 as shown on plan sheet 27 <br /> at $19.90 per linear foot of pipe <br /> and $350 for the flared end <br /> <br />$2,638,50 <br /> <br />8. Revise the street grades at 149th <br /> Avenue and its intersection with <br /> Yakima St. and Xkimo St. as <br /> shown on plan sheets 12,13,21,22, <br /> 23,26 & 28. <br /> <br />0 ~ <br /> <br />Totals - <br /> <br />0 $9,860.50 <br /> <br />Net Change in Contract Price - <br /> <br />$9,860.50 <br /> <br />Description and Location of Work: <br /> <br />The location of the work is shown on the revised plan sheets. The <br />alignment of the subtrunk sewer and the lowering of the street grade <br />was made to-save trees on the project. The addition of the trunk <br />watermain is to provide future service to the west side of T.H,~47. <br />Future installation of the watermain would require tearing up the <br />street or acquiring an additional easement. The storm sewer between <br />Lots 13 and 14 is required to drain the back of Lots 12, 13 and 14, <br />Block 5 of River's Bend. The street grade on 149th AVenue was revised <br />to meet MSAS standards. <br /> <br />Ail work shall be done in accordance with the contract documents or as <br />directed by the engineer. <br /> <br />The amount of the contract will be increased by the sum of: $9,860.50. <br /> <br />The contract total including this change order will be:·$856,024.25. <br /> <br />The contract period provided for completion will be unchanged. <br /> <br />This document will become a supplement to the contract and all· <br />provisions will apply hereto. <br /> <br />It is understood that this agreement is not valid until the <br />appropriate signatures are affixed. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.