Laserfiche WebLink
I <br />'1 <br /> I <br /> I <br /> ! <br /> I <br /> I <br /> I <br /> i <br /> ! <br /> I <br /> I <br /> I <br /> <br /> I <br /> I <br /> I <br /> I <br /> <br />Findings of Fact <br />River's Bend <br />page 5 July, 1984 <br /> <br />The following is a list of reports relating to construction of <br />Wastewater Facilities which will serve the proposed development: <br /> <br />"CAB Facilities Study Committee Report," Metropolitan <br />Council, May, 1976 <br /> <br />"North Area Sanitary Sewer Study," Metropolitan Council, <br /> prepared by Orr Schelen Mayeron and Associates, <br /> November, 1973 <br /> <br />"Analysis and Treatment at Anoka Wastewater Treatment <br /> Plant", Metropolitan Waste Control Commission, <br /> September, 1975 <br /> <br />"Design Report, Anoka Interceptor," prepared by Short <br /> Elliot Hendrickson, Inc., March, 1978 <br /> <br />"Facilities Planning Report for the Champlin Anoka <br /> Brooklyn Park Interceptor," Metropolitan Waste Control <br /> Commission, prepared by Orr Schelen Mayeron and Assoc- <br /> iates, March, 1975 <br /> <br />"Review of North Area Sanitary Sewer Study," Metropoli- <br /> tan Waste Control Commission, prepared by Orr Schelen <br /> Mayeron and Associates, Toltz King, Duvall Anderson and <br /> Associates, and Consulting Engineers Diversified, Dec- <br /> ember, 1974 <br /> <br />"Northwest Area Study, Final Report," Metropolitan Waste <br /> Control Commission, prepared by Consulting Engineers <br /> Diversified and CH2 MHill, June, 1980 <br /> <br /> <br />