Laserfiche WebLink
I <br /> I <br /> I <br /> i <br /> I <br /> I <br /> I <br />'1 <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br />Page 2 <br />July 18, 1984 <br /> <br />Central Park Construction: The well at Central Park was tested <br />on July 16 and 17, 1984. Test results show that the well can <br />produce up to 500 gallons per minute sand-free. The proposed <br />pumping rate is 280 gallons per minute. The mechanical and <br />electrical hookup are scheduled to be completed next week. Also, <br />the additional irrigation heads are scheduled to be installed <br />next week. <br /> <br />Rolling Green and Magnesium Street: These projects were awarded <br />at the June 12, 1984 council meeting to Hardrives, Inc. <br /> <br />Rolling Green was paved last week and Magnesium Street is <br />scheduled for paving in the near future. <br /> <br />Street Seal Coating: The seal coating projects were awarded to <br />Allied Blacktop Company at the June 12, 1984 council meeting. <br />Construction is scheduled to begin on July 24, 1984. <br /> <br /> <br />